Herunterladen Inhalt Inhalt Diese Seite drucken

Suitable Installation Materials; Installation; Install Ceiling Bracket; Install Floor Bracket - FLORABEST 296717 Gebrauchsanweisung

Klemmmarkise
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
For floor installation, a concrete
foundation or concrete slab of at least
50 x 50 x 5cm (L x W x D) is suitable.
Note: Alternative installation
conditions must have the load-bearing
capacity and strength inspected by a
specialist.

Suitable installation materials

Before installing the item, the material
must be determined.
If the installation site is load bearing,
then the appropriate materials for
fixing to it must be selected.
Fixing materials:
• Dowel Ø 10/50 (13) and screw
ST6 x 50mm (14) for concrete and
load-bearing masonry.
• Screw ST6 x 50mm (14) for
load-bearing wooden beam
constructions.
Note: Please consult your local
specialist store for fixing materials
suitable for floor and ceiling brackets.

Installation

Install ceiling bracket

Important: Both ceiling brackets
must be perfectly aligned and have a
distance of exactly 288cm from each
other (measured between the inner
edge of both ceiling brackets) (Fig. F).
1. Place the ceiling bracket (11) in
the desired position und mark
2 opposing holes with a pencil
(Fig. B).
18
GB/IE
2. Using the correct tool, drill 2 holes
in the marked places. Insert 1 dowel
(13) into each hole (Fig. C).
3. Place a rubber plate (10) on each
ceiling bracket (11). Insert 2 screws
(14) into a washer (18) each and
screw the screws (14) in slightly to
the rubber plates to fix them in place
(Fig. D).
Note: This step makes it easier to fix
the ceiling bracket to the ceiling later.
4. Fit the ceiling bracket to the ceiling
(Fig. E).
5. Fit the second ceiling bracket as
described in steps 1–4.

Install floor bracket

1. Plumb the exact position of the
floor bracket (12) with a cord (not
included in the package contents).
Mark the correct place and using
a pencil mark 2 opposing holes
(Fig. G).
Note: The floor bracket (12) must be
positioned perpendicular to the ceiling
bracket (11).
2. Using the correct tool, drill 2 holes
in the marked places. Insert 1 dowel
into each hole (Fig. H).
3. Place a rubber plate (10) on each
floor bracket (12). Insert 2 screws
(14) into a washer (18) each and
screw the screws (14) in slightly to
the rubber plates to fix them in place
(Fig. I).
Note: This step makes it easier to fix
the floor bracket to the floor later.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis