Herunterladen Inhalt Inhalt Diese Seite drucken

HPE StoreOnce 5500 System Kurzanleitung Seite 4

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

3.
Install the 1U support shelf immediately below
the location of the disk enclosure.
4.
Holding the handles (1), lift the disk enclosure
onto the rails and push it into position (2).
Tighten the thumbscrews (3) to secure the unit
to the rack.
WARNING!
people to lift an enclosure into the rack
and ensure the unit is aligned with the
rails. If the enclosure is being loaded into
the rack above chest level, a third person
must assist with aligning the enclosure
with the rails while the other two people
support the weight of the enclosure.
5.
Attach the retaining brackets (1) to either side
of the rear of the disk enclosure and secure
them to the rack.
Always use at least two
6.
Insert the two locking nuts for the server into
the rack; one on each front column.
Install the base server unit into the rack and
secure it using the thumbscrews on the unit's
front bezel.
7.
Attach the security bezel to the front of the
server unit.
NOTE:
attached to the back of the security
bezel. One key is supplied.
2
Step 5: Connect the SAS cables
IMPORTANT:
start when the system boot, the SAS cabling
may be incorrect. See the troubleshooting
chapter in the HPE StoreOnce 5500 System
Capacity Upgrade Guide for more
information.
The instructions below describe how to cable the
first disk enclosure that is bundled with the head
server. It can be identified by the label on the
bottom of Drawer 2, which states <JBOD1> for
<server_serial_number>.
Page 4
The key to lock the bezel is
4
3
1
If the service set does not
Inhaltsverzeichnis
loading

Verwandte Produkte für HPE StoreOnce 5500 System

Inhaltsverzeichnis