Herunterladen Inhalt Inhalt Diese Seite drucken

Chlorine Production - Davey EcoSalt 2 DES2-25EL Installations- Und Betriebsanweisungen

Chlorungssystem für salzbetriebene pools
Vorschau ausblenden Andere Handbücher für EcoSalt 2 DES2-25EL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33

CHLORINE PRODUCTION

The EcoSalt2 must be run daily to generate sufficient chlorine to sanitise the pool. During summer a typical
installation would require eight hours per day of chlorination. Depending on when you choose to run the
EcoSalt2, it is best to test the residual Chlorine in the pool at the point where you would anticipate the levels
be at their lowest. At that chosen time of the day, if the residual Chlorine level from your test is reading too
high, reduce the EcoSalt2 CHLORINE OUTPUT. Alternatively, if the residual Chlorine level from your test is
reading too low, increase the EcoSalt2 CHLORINE OUTPUT (refer to page 13). Correct chemical balances
(see page 29) are critical to ensure the EcoSalt2 performs correctly.
In cooler times of the year, it's typically possible to reduce running hours of the EcoSalt2. Follow instruction
from your pool professional. Chlorine output can also be reduced throughout this time by entering WINTER
MODE, (see page 19).
"SHOCK" TREATMENT
Periodically, especially during extremely hot conditions, it may be necessary to boost the chlorine level in the
pool. This can be achieved by selecting BOOST MODE, which will run the system on full for 24 hours, (see
page 15). Alternatively, add either liquid, or granulated chlorine. If granulated chlorine is added, the cell must
be checked regularly, since the additives from this product can clog the electrodes.
CHLORINE TYPES AND COMPARISONS / MAX POOL SIZE
Many chlorinator manufacturers calibrate their units to compare with 65% granulated chlorine, making it
necessary to adjust their readings to a lower level in order to determine true chlorine production. Below is a
comparison table of the available types of chlorine used to sanitise pools.
Production
EcoSalt2
Maximum
Model
(g/hr 100%)
DES2-15E(L)
15
DES2-25E(L)
25
DES2-35E
35
NOTE: The appropriate EcoSalt2 for your pool is dependent on the local climate,
bather load of the pool and running times. Please note that the EcoSalt2 cell life can be
increased with shorter running times during winter and lower output settings. Davey
recommends the EcoSalt2 be run for between 6 - 8 hours a day during summer, and 4
hours during winter.
Chlorine
Production
produced
(g/hr 65%
over 8 hours
equivalent)
(grams 100%)
23
120
38
200
53
280
28
Maximum Pool Size
Temperate
Cool Climates
Climates
<25ºC
25ºC to 30ºC
75m
58m
3
125m
96m
3
175m
134m
3
Hot & Tropical
Climates
>30ºC
46m
3
3
80m
3
3
112m
3
3

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis