Herunterladen Diese Seite drucken

Grohe Rapid SL series Installationsanleitung Seite 6

Vorschau ausblenden Andere Handbücher für Rapid SL series:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Approval and conformity
0682
!
; 0700 !
This product conforms to the requirements of the relevant
EU guidelines.
The conformity declarations can be obtained from the following
address:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
D-32457 Porta Westfalica
New installations
During installation, please note
• The distance between the control unit and the sensor must
not exceed 50m.
• The control unit must be easy to access for maintenance
work.
• During electrical installation outside the element, route the
supply line with a loop from below to the bowl inlet,
see fold-out page I, Fig. [1]. Attention should be paid to rises
in the last section.
Installation in front of wall, see fold-out page II, Fig. [2-12].
Installation inside a stud partition, see fold-out page III,
Fig. [13-20].
Water connection
Do not solder the connections between the pipe and
housing, otherwise the built-in isolating valve may be
damaged.
1. Connect water supply line (B), see Fig. [23].
2. Close isolating valve (A).
3. Open hot and cold water supply and check connections
for water-tightness!
4. Open isolating valve (A) and flush pipes
(Consider EN 806).
5. Close isolating valve (A).
3
Electrical installation
Electrical installation work must only be
performed by a qualified electrician. This work
must be carried out in accordance with the
regulations to IEC 60364-7-701 (corresponding to
VDE 0100 Part 701) as well as all national and
local regulations.
• Only round cables with max. outside diameter 6 to 8.5mm
may be used.
• The voltage supply must be separately switchable.
1. Connect the earth cable, see fold-out page IV, Fig. [24]
2. Insert 230 V connecting cable (D) into the transformer
base (E). Strip insulation in accordance with Fig. [24].
3. Pull sleeve (C1) over the two live wires (D1).
4. Attach lustre terminal (C); observe assignment,
see Fig. [25].
5. Secure all three wires with the cable tie (C2) near the lustre
terminal (C).
6. Route cable (D2) in an arc and position lustre terminal (C)
on locators in transformer base (E), see Fig. [26] on
fold-out page IV.
7. Secure cable (D) using screws (F) and strain relief (G).
8. Fasten cover (H) in base (E) using screw (I).
Further installation
Note for installer:
• No water lines must be routed in front of the sensor,
see Fig. [27]. This would lead to malfunctions.
• Do not carry out any further installation procedures until the
tiling is completed.
Note for tiler:
• Do not obstruct inspection aperture for isolating valve
and electronics, see Fig. [27].

Werbung

loading

Diese Anleitung auch für:

Rapid sl 38 511