Herunterladen Inhalt Inhalt Diese Seite drucken

Jack-Up; Adjusting The Internal Lift-Off Protector - Sartorius Contego Typ D1 Installationshanbuch

Hygienisches wägemodul mit wägezelle pr 6241 100 kg / 200 kg...2 t
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Hygienic Weighing Module Contego®
2.3.2

Jack-up

2.3.3

Adjusting the Internal Lift-Off Protector

EN-6
Procedure
Release the locknut (2).
Turn up the screw (1) at the hex to lift the vessel.
Caution: Don't lift the vessel by more than
6 mm!
Turn the bolt until the load cell is unloaded and
can be removed together with the upper thrust
piece.
Insert the upper thrust piece into the new load
cell.
Insert the load cell into the mounting kit, push
the load cell cable through the cable gland and
block it; refer to Chapter 8.1.2.
Adjust the internal lift-off protector; refer to
Chapter 2.3.3.
Procedure
Release the locknut (2).
Turn the bolt (1) of the lift-off protector at the
hex (3) fully down to the stop.
Turn the bolt back by 1...1½ revolutions
(approx. 2 mm) to adjust the spacing.
Re-tighten the locknut (2).
Installation Manual
Sartorius

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis