Herunterladen Inhalt Inhalt Diese Seite drucken

Accessory Parts Normally Available On The Market And Required For Installation; How To Install The Appliance - Ferroli VM-B 20 Betriebs- Und Wartungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ACCESSORY PARTS NORMALLY AVAILABLE ON THE MARKET AND REQUIRED FOR INSTALLATION

The following items are also required:
- Plumbing unions
- Anti-condensation tape
- Adhesive tape
- Copper pipe of flexible steel pipe with built-in unions
- Ø 8mm press-in plugs

HOW TO INSTALL THE APPLIANCE

The position chosen for the installation must allow the convector fan to be easily serviced. It must also ensure access
to the air vent valve at the side of the frame (housed in the wet connections). Proceed in the following way to install
the appliance:
1. Disconnect the electricity main and make sure that no one is able to connect it again during the installation work.
2. Remove the intake filter as illustrated in Fig.1 (model VM-B only)
3. Remove the four screws (1-Fig.1) that fix the casing to the frame. Take out the casing (version VM-B VM-F only)
4. If the appliance is to be wall-mounted, use the supplied template to center the holes. Maintain a distance of at least
100 mm for the VM-B version. If the appliance is to be installed on the floor on feet, comply with the assembly
instructions supplied with the accessory.
5. For fixing to the wall or ceiling use screw anchors (not supplied) of diameter 8-10mm (2 fig.1).
6. Make the wet connections. Refer to Fig. on page 11 for the positions of the plumbing connections. It is advisable
to insulate the water pipes or to install trays, available as accessories for both the horizontal and vertical configu-
rations, to prevent water from dripping when the appliance operates in cooling mode. The cindensation draining
network must be sized to ensure that the pipes slant to a sufficient extent (at least: 1%). If the condensation is
drained into the sewers, it is advisable to make a trap to prevent unpleasant odours from rising back into the room.
7. Make the electric connections as describerd in the SAFETY REGULATIONS chapter and with reference to the
wiring diagrams in this manual.
8. Fit the air filter back in position (version VM-B only).
9. Hook up the electricity main again.
Fig.1
113,5
INSTALLATION
1
2
19

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis