4. Installation

4.3. Signalling of Grid Management

Signalling of grid management is handled by the ripple control receiver of the DNO. The con-
nection between the ripple control receiver and the CLX GM is type-dependent. It is described
4
here using a Landis+Gyr
Illustration 4.2: Grid Management - Connections
The ripple control receiver is connected as follows:
Input Terminal Strip
Note:
Detailed configuration of grid management is done via the grid management menu of the
master inverter.
10
Like all electronic equipment, all products in the CLX GM must be protected from
humidity, in particular condensation.
®
receiver as an example.
Function
+S
12-30 VDC
-S1
Relay input 1
+S
12-30 VDC
-S2
Relay input 2
+S
12-30 VDC
-S3
Relay input 3
+S
12-30 VDC
-S4
Relay input 4
A2-
A2+
A1-
A1+
To avoid damage to the CLX GM unit and the ripple control receiver, only an au-
thorised and suitably trained electrician must set up the connection.
Ripple Control Receiver Connector (K)
N/A
N/A
N/A
N/A
L00410637-01_5b
K1
K2
K3
K4
(0)4 .. 20 mA
(0)4 .. 20 mA