Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Maintenance - Honeywell KaltecSoft KS10S Einbauanleitung

Enthärtungsgerät
Vorschau ausblenden Andere Handbücher für KaltecSoft KS10S:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

11. Operation

11.1 Changing time raw water hardness and resi-
dual water hardness
1. MENU / OK
o Display Current time flashes
2. Continue with point 2 to 7 chapter 10.2
No regeneration needs to be carried out.
11.2 Initiating a manual regeneration
It is possible to initiate a manual regeneration
(within the 4-day interval). The manual regenera-
tion is carried out immediately.
1. Press the REGENERATION key for 5 seconds
o Display Regeneration active flashes
REGENERATION ACTIVE
o After completion of the regeneration (duration
about 45 minutes), the device returns automati-
cally to the normal operating mode
If the water was switched off for a longer period
(more than 4 days), it is recommended to carry
out a manual regeneration after re-establishing
the water supply.
11.3 Refilling salt tablets
Check the salt supply (e.g. monthly) in the device
Use only salt tablets acc. DIN 19604.
1. Open the salt container cover
2. Refill salt
11.4 Cleaning
Do not use cleaning agents that contain solvents
when cleaning the plastic parts!
Detergents must not be allowed to enter the
environment or the sewerage system!
1. Clean the housing with water and a cloth inside and
out
11.5 Further information
11.5.1 Power Failure:
Brief power failure:
All settings including the time remain intact
After longer power outage:
o Display Current time flashes
MU1H-1417GE23 R0110
GB
o Continue with point 2 to 11 chapter 10.2
The settings, excluding the time remain intact,
but need to be confirmed with MENU / OK .
The regeneration needs to be carried out to
return to the normal operating mode.

12. Maintenance

In compliance with European and national norms (e.g.
DIN 1988 part 8) regular maintenance must be
conducted.
Maintenance work should only be carried out be
qualified staff!
Interval: yearly
1. The completed maintenance work needs to be
documents in the maintenance log (chapter 17).
The following maintenance work needs to be carried
out:
12.1 Replace disinfection unit
The disinfection unit has a service life of 100
regenerations (about 1 year) and needs to be
replaced after that.
Maintenance work should only be carried out be
qualified staff!
Please contact your professional plumber or
Honeywell's technical customer services.
The disinfection unit DE10S-A is needed for the
replacement.
12.2 Inspection suction pump
Maintenance work should only be carried out be
qualified staff!
Please contact your professional plumber or
Honeywell's technical customer services.
The maintenance kit EK10S-B is needed for
maintenance of the suction pump.
12.3 Inspection seal kit for controller head
Maintenance work should only be carried out be
qualified staff!
Please contact your professional plumber or
Honeywell's technical customer services.
The controller head seal kit EK10S-A is needed
for the replacement.
12
Honeywell GmbH

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis