The grinding group Enterprise assembly on the machine takes place in two phases (in exemplifying way it is showed the
mincer with basic machine.
The phase n. 1 for the grinding group
Enterprise is performed on a working ground
following the under reported order:
1. Insert in the pipe union (1) in the order:
Archimedean screw (2), cutting knife
oriented as in figure and inserted in the
dragging pivot (3), drilled plate (4)
inserted in the pipe union place (1);
2. Screw down and tighten the blockage
wheel (5).
The phase n. 1 for the Half Unger grinding
group is performed on a work round following
the under reported order:
1.
Insert in the pipe union (1) in the order:
Archimedean screw (2), first plate (3),
cutting knife oriented as in figure and
inserted in the dragging pivot (4), second
drilled plate (5) inserted in the pipe union
place (1), ring (6);
2.
Screw down and tighten the blockage
wheel (7).
The phase n. 1 for the Total Unger grinding
group is performed on a work round following
the under reported order:
1.
Insert in the pipe union (1) in the order:
Archimedean screw (2), first plate (3),
cutting knife oriented as in figure and
inserted in the dragging pivot (4), second
drilled plate (5) inserted in the pipe union
place (6), third drilled plate (7) inserted in
the pipe union place (1), ring (8);
2.
Screw down and tighten the blockage
wheel (9).
The phase 2 is performed on the machine:
1.
Insert up to the blow the complete
grinding group (B) on the machine (A);
2.
Tighten the mouth stop knob (C) up to
when the grinding group (B) is blocked
on the machine (A);
3.
Insert the hopper (D) in the machine neck
4.
In these conditions the machine is ready
to work.
The disassembly activities of the grinding group from the machine are performed following in the backwards way the
assembly phases previously described, starting from the phase n. 2 passing to the phase n. 1.
For a plate and knife better improvement and duration it is advised to keep them always coupled.
GRINDING GROUP ROTATION
The operations here follow indicated must be performed from the machine maintenance man (skilled personnel in
the electric maintenance field of the industrial machines).
For machines fed with three phase voltage (3 PE AC 400V 50Hz), slacken lightly the blockage wheel so as
don't make a strong pressure on the drilled plate as for the cutting knife. During the switching on verify that the
Archimedean screw / grater roll rotates in anticlockwise sense.
If there is an clockwise rotation, switch off the machine disconnecting the plug, disassembly it, disconnect two
phase conductors and invert them of position.