Herunterladen Inhalt Inhalt Diese Seite drucken

Pipe Connections - Nibe ELK 26 Installateurhandbuch

Elektroheizkassette für nibe f1145, f1155, f1255, f1345, vvm 500, smo 20, smo 40
Vorschau ausblenden Andere Handbücher für ELK 26:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Pipe connections

General
The pipe installation must be carried out in accordance
with applicable standards.
A circulation pump must be used to ensure the flow
over the immersion heater. If the heating system valves
can close the circulation completely, the bypass valve
must be installed so that the flow through the electric
heater does not stop. In closed installations an ap-
proved safety valve and pressure expansion vessel must
be used.
Caution
Also see the installer manual for your heat
pump/indoor module.
NOTE
The pipe work must be flushed before the
electric heater is connected, so that any con-
taminants do not damage the component
parts.
Draining
The system is most easily drained by installing a drain-
age valve at the lowest point on the pipe installation.
The remaining water in ELK 26 is drained through the
return line connection (XL2), see "Component location"
on page 12. If the return line connection on ELK 26 is
normally used for draining the unit, a drain valve can
be installed here.
Pressure drop diagram ELK 26
kPa
6
5
4
3
2
1
0
0
500
1000
1500
2000
Flow
l/h
2500
3000
3500
4000
GB
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis