Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation to I-beam

• Installer must verify that the supporting beam will safely support the combined weight of all attached equipment and
hardware.
Thread four bolts (T) through eight washers
1
(V), ceiling clamp (C), ceiling plate (A), and four
locknuts (U) as shown.
Repeat for second ceiling clamp.
C
A
Lift ceiling plate (A) up to I-beam and slide ceiling
3
clamps (C) as close to the center of the I-beam as
possible. NOTE: Tube of ceiling plate should be
centered below I-beam.
Alternate between tightening bolts (T) of right
clamp and left clamp until bolts evenly apply force
to each clamp.
I-BEAM
T
LEFT CLAMP (C)
WARNING
T
T
V
V
U
T
RIGHT CLAMP (C)
A
TUBE
4 of 36
Thread four hex nuts (Y) onto four bolts (T).
2
Thread four bolts (T) into side of ceiling plate (A),
but do not tighten.
A
Y
Tighten square head bolts (S) through ceiling
3-1
clamp and onto I-beam.
Check bolts (T) and locknuts (U) from previous
step to ensure they are still secure.
ISSUED: 06-22-10 SHEET #: 061-9055-7 07-08-15
S
T
U

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis