Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

Wall drilling and bracket fixing
Wall marking:
• Rest the Bracket 7.2.1 as indicated 1-2 mm
from the ceiling or top limit.
• Mark the centres of the Bores in the Bracket.
• Rest the Bracket 7.2.1 as indicated X mm
under the first bracket (X = height of the Top
Chimney provided).
• Mark the centres of the Bores in the Bracket.
• Rest the Hood Coupling Support 7.1 as in-
dicated 1004 mm above the Cooker Top,
checking that the fixing bores are equidistant
from the corner of the wall.
• Mark the centres of the Bores in the Support.
• Drill the points marked with a ø 8 mm drill bit.
• Insert the plugs 11 into the holes.
• Draw a Horizontal line on the Wall 668 mm
above the Cooker Top.
• Rest the Safety Brackets 7.5 as indicated on
the reference Horizontal line, at a distance of
958 mm from the corner of the wall, checking
that they are level.
12r
11
12a
• Mark the centres of the Bores in the Safety
Brackets.
• Drill the points marked with a ø 8 mm drill bit.
• Insert the plugs 11 into the holes.
• Fix the Brackets and the Support, using the
Screws 12a (4.2 x 44.4) provided.
• In case of recycling version installation, you
should fix the upper bracket 7.2.1, the holder
7.4, the bracket 7.3 to the holder 7.4 and the
recycling connector 15 to the bracket 7.3.
• Fasten 2 Screws 12r (4.2 x 12.7) provided into
the Hood Canopy fixing holes, positioned on
the front plate of the Hood Coupling Support,
leaving a space of 5-6 mm between the sup-
port and the head of the screw.
11
7.2.1
12a
7.4
7.3
12a
958
11
7.1
7.5
ENGLISH 9
1÷2
958

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Wegl1030cn

Inhaltsverzeichnis