Herunterladen Inhalt Inhalt Diese Seite drucken

Cableway And Passage; Start Up; Purging The Appliance - Vaillant VWZ MEH 60 Installationsanleitung Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für VWZ MEH 60:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.4.2.2
With 4 kW electrical booster
N
L
L
L
1
2
3
4.4.2.3
With 6 kW electrical booster
N
L
L
L
N
1 2
1
2
3
4.4.2.4
With multi-stage booster
2kW
4kW
Key
1
Electrical booster module
2
Towards command relay
3
Electrical shunt
4.5

Cableway and passage

i
Notes
The cables must pass through the openings
provided for this purpose.
1
Key
1
Passage for power cables and relay command cables
2
Temperature probe cable passage
Caution!
b
Comply with electrical cable routing !
Keep a distance of 10mm between
connecting cables and metallic elements
that are a heat source.
0020152779_03 - 07/13 - Vaillant
1
N
1 2
2
1
3
2
1
1 2
N
L
L
L
N
1
2
3
2
2
2
1
Key
1
Power cable (*)
2
Relay command cable (*)
3
Temperature probe cable (Sensor included no mounting)
(*)
Not included
Notes
i
The temperature probe must be assembled
using thermal paste for good heat transfer.
5

Start up

∙ For fi lling, refer to the installation instructions of the heat
pump.
∙ Check the electrical and water installation.
∙ Check all connections for leaks..
∙ Purge your heating system.
∙ Replace the power.
5.1

Purging the appliance

1
Key
1
Air vent
∙ Open the air vent (1), when fi lling the heating circuit with
water.
START UP
3
EN
24

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

0020145030

Inhaltsverzeichnis