Herunterladen Inhalt Inhalt Diese Seite drucken

Understanding Your Energizer - Gallagher PowerPlus B40 Betriebsanleitung

Elektrozaungerät
Vorschau ausblenden Andere Handbücher für PowerPlus B40:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
Moving your fence
1.
Switch off the Energizer.
.
Remove the red lead from the fence.
3.
Remove the green lead from the earth stake.
4.
Wrap leads around terminal posts.
5.
Remove earth stake from the ground and slide into stowage slot.

Understanding your Energizer

Indicator LED
The indicator LED flashes with each pulse of the Energizer.
The LED flashes:
green when the battery is in good condition, and
red when the battery needs to be recharged, or replaced.
Depending on the operating mode, the Energizer will run for 1-5 days.
Refer to the Battery Management section for more information on your Energizer
battery
8

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Powerplus b50

Inhaltsverzeichnis