Herunterladen Inhalt Inhalt Diese Seite drucken

Transport Between Work Areas; Transport; Maintenance - Zgonc yellow gardenline 720 YGL N.G. Originalanleitung

Benzin-schneefräse
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Warm Start
Follow the steps above, wherein the choke control remains in the OFF position and do not use the aspirator.
Allow the engine to warm up for a few minutes, engine will not develop full power until it has reached normal operating temperature.
In snowy and cold conditions, some controls and moving parts may freeze. Do not use excessive force when trying to operate frozen
controls. If you have difficulty operating any control or part, start the engine and let is run for a few minutes.
Snow Throwing Tips
It is easier and more efficient to remove snow immediately after it falls.
The best time to remove snow is the early morning. At this time the snow is usually dry and has not been exposed to the direct sun and
warming temperatures.
Slightly overlap each successive path to ensure all snow will be removed.
For large areas, start in the middle and throw snow to each side, so snow is not cleared more than once.
For extremely heavy snow, reduce the width of snow removal by overlapping previous path and moving slowly.
Throw snow downwind whenever possible.
Keep engine clean and clear of snow during use. This will help air flow and extend engine life.
After snow-throwing is completed, let the engine run for a few minutes to help dry off the moisture on the engine and prevent moving
parts from freezing. Engage the auger/impeller to clear any remaining snow from inside the housing. Rotate the discharge chute to
prevent it from freezing. Stop the engine, wait for all moving parts to stop, and remove all ice and snow from the snow thrower. With the
engine off, pull the recoil starter handle several times to prevent the recoil starter from freezing up.
To travel from one work area to another:
1.
Set throttle to slow or part-throttle position.
2. On wheeled model, press down on handle bars enough to raise front of unit slightly off surface; on tracked model, move the track
lock lever into the transport position.
3. Engage drive clutch without engaging auger clutch.
m Always shut off engine, remove key, and close fuel shut-off valve when transporting unit on a truck or trailer. Do not transport ma-
chine while engine is running.
Use extra care when loading or unloading unit onto trailer or truck.
Secure unit chassis to transport vehicle. Never secure from rods or linkages that could be damaged.
Engine
Engine oil change
The 1st oil change must be carried out after 20 operating hours. It must take place after 100 operating hours thereafter.
The engine oil should be heated slightly (approx. 50°C) before carrying out oil changes. This makes it more viscous so that it flows more
easily. If necessary, run the engine for a brief period.
1
If the model has a wheel drive, remove the right wheel drive on the oil outlet side by pulling out the axle pin and draining it into a suit-
able pan (min. 1 l) positioned below. With a rubber drawler drive, use a long, oil-resistant hose or oil-resistant tube.
2
Open the oil drain plug and filing port (dipstick) and allow the oil to drain completely.
3
Close the oil drain plug again and tighten it hand-tight.
4
Top up oil with a funnel, check the oil level with the dipstick and seal it again.

Transport between work areas

Transport

Maintenance

49
D GB

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Yellow gardenline 770 ygl n.g.

Inhaltsverzeichnis