Herunterladen Inhalt Inhalt Diese Seite drucken

Chapter 7: Installing Pump - EVGA HADRON Bedienungsanleitung

Hydro water cooling kit
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 11
4. Next, we prep the radiator for installation. First, line the
horizontal threaded fittings up with the rear bracket previously
removed, make sure the holes match up, as the radiator can
be installed upside-down.
5. Install 2 standoffs at the rear of the radiator, this will allow
you to mount the bracket to the radiator, and have the holes
for the coolant hoses line up. There are 2 holes in the top of
the bracket that line up with the standoffs, use 2 of the black
flathead machine screws to attach the bracket to the radiator.
Do not fully tighten the screws, as to allow for easy alignment
of the bracket to the chassis.
6. Next, install the radiator. Make sure the bracket and lateral threaded holes are facing towards
the rear of the Hadron. You will need to install the radiator at a slight angle, with the bracket being
slightly higher than the front side. Slide the radiator under the alignment tabs in the front of the
Hadron, then rest the radiator on the alignment bolts, these will go into holes on the bottom of
the radiator framing, and when settled all the way you will see that the lower holes in the bracket
line up with bolt holes in the back of the case.
7. Install the two machine screws through the bracket into the case, these holes are below the
large threaded holes for the hose fittings.
8. Take the top cover, align tabs on the cover with the notches on the side of the top of the case.
The cover should be around half an inch off of the front of the Hadron, slide the top down until
it is resting on the chassis and slide it back to lock it into position. You can now take 2 more
machine screws and attach the top to the rear bracket.
12

Chapter 7: Installing Pump

1. Attach the pump by connecting the tabs on the back of the
mounting frame into the back of the case, there are 4 matching holes
that taper as they go down. Slide it down until it latches into place.
2. Attach the pumps mount to the rear of the Hadron with 2
machine screws, this will keep the pump from bewing able to be slid
out of its alignment slots.
Chapter 8: Installing Water Tubes
1. Now that the radiator and the top cover are secured, you will need to attach the connections to
the back of the radiator. Take a 90 degree fitting, and the longer rectangular extension, thread the
female end of the 90 degree fitting onto the male end of the rectangular extension, and tighten it
by hand until it is tight (in most cases until it no longer twists by hand).
English
English
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis