Herunterladen Inhalt Inhalt Diese Seite drucken

Dometic MPC01 Montage- Und Bedienungsanleitung Seite 12

Vorschau ausblenden Andere Handbücher für MPC01:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 24
Connecting and installing MPC01
7.4
Connecting and installing the adapter board
➤ Screw the cover and the adapter board in place at a suitable location using two
screws.
➤ Secure the connected cables using suitable fittings, e.g. cable clamps, to ensure the
plug cannot be torn from the circuit board.
I
NOTE
 Supply battery A must be connected to the IBS-B2A connection for the
MPC01 to be able to display data.
 Up to three supply batteries (IBS_B2A, IBS_B2B and IBS_B2C) and a
starter battery (IBS_B1) can be connected.
➤ Depending on the number of supply batteries connected, assign the connections as
follows:
– Connecting one supply battery: IBS_B2A (fig. 5 10, page 5)
– Connecting two supply batteries: IBS_B2A (fig. 5 10, page 5) and IBS_B2B
(fig. 5 7, page 5)
– Connecting three supply batteries: IBS_B2A (fig. 5 10, page 5), IBS_B2B
(fig. 5 7, page 5) and IBS_B2C (fig. 5 9, page 5)
➤ Connect the connection cables as follows:
No. in
fig. 5,
Designation
page 5
1
OUT 1
2
OUT 3
3
4
5
OUT 2
6
7
IBS_B2B
8
IBS_B1
9
IBS_B2C
10
IBS_B2A CI bus Connection for supply battery A, charger unit
12
Explanation
Switchable output 1 for consumer units
Switchable output 3 for consumer units
2a: +12 V
2b: connected mass
Voltage supply connection
3a: +12 V
3b: connected mass
Connection for MSK, MSI and MSP series inverters
Switchable output 2 for consumer units
Connection for display
Connection for supply battery B
Connection for starter battery
Connection for supply battery C
MPC01
EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis