Herunterladen Diese Seite drucken

Werbung

EN
1. pleaSe reaD theSe inStrUctionS carefUlly anD completely Before aSSemBlinG yoUr GreenhoUSe.
2. Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profiles, glass and
polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.
3. The product you have purchased is intended only for growing plants and should only be used for this purpose. When used for other purposes we will take
no responsibility.
4. It is recommended that this greenhouse is assembled by two people.
5. Should you encounter difficulties constructing this house, or in fitting the glass or polycarbonate sheets, please contact your retailer
– do not use force!
6. The greenhouse must always be anchored.
Site Selection
Always try to select a sunny location, sheltered
from the wind as much as possible.
important
Before assembling your new greenhouse,
please check that all parts in the provided list
are included. Please take each bundle out of
the packaging in order to identify the parts
better.
It is important that the opened bundles do not
get mixed with one another.
If something is missing please contact your
retailer.
important! The UV-resistant side of the
polycarbonate panes is indicated by the plastic
film and printing at the edge. This side must
face outside. Remove the film.
nuts (1002) - max. tightening torque 3nm.
neceSSary toolS
Screw drivers (Normal and Crosshead PH2),
10 mm socket spanner or wrench, 10 mm
combination spanner, knife, measuring stick,
spirit level, fine tooth saw, Accu-drill with adju-
stable torque.
maintenance
The greenhouse should be thoroughly washed
with a gentle detergent occasionally. Please
check that the detergent used does not react
aggressively with aluminium or the glass fixing
clips.
Ensure that the upper and lower door tracks
are cleaned regularly to avoid a build up of
debris.
0. BaSe
important! The base must be exactly square
and level. A zinc-coated steel base is available
as an accessory for all greenhouse models.
(attention! Only when the greenhouse has to
be located in a very windy and unprotected
6

Safety Warning

assembly Instructions
location: Drill through both the profile at the
base of the greenhouse and the steel base,
and connect them with nuts and bolts.)
If you would rather construct your own stone
or concrete foundation, please follow the
dimensions specified in diagram 0. Treated
wooden beams at least 18 mm high and not
more then 32 mm wide should be positioned
between the stone/concrete foundation and
the aluminium frame, and connected to the
foundation with 50 mm long bolts (not pro-
vided).
Foundations must extend down below the frost
level.
Diagrams in a single frame show the view
from inside the greenhouse. those enclo-
sed in a double frame show the view from
outside the greenhouse.
1. plain GaBle enD
Lay all of the parts on the floor and connect
them loosely as shown.
Loosely connect the corner plates (1092) on
the upper corners (1.7).
2. SiDe aSSemBly
Loosely connect glazing bars (4232) between
the sill bars and horizontal bars.
3. Door GaBle enD
Insert brush seal (4276) into the channel in
ridge bar (4250) (3.6).
Lay all of the parts on the floor and connect
them loosely as shown.
Please include 2 extra bolts in glazing bars
(2101) for the connection of brace (2092) (3.2)
and horizontal braces (2089 / 2090) (3.4).
Loosely connect the corner plates (1092) on
the upper corners (3.7).
4a. connectinG the Separate
elementS
Bolt the plain gable end (section 1), side ele-
ments (section 2) and door gable end (section
3) together (4.1) (4.4) (4.5) (4.6).
Assemble the diagonal braces (4233) (4.3)
and (4235) (4.2).
Loosely connect roof corner bars (4239 / 4240,
4245 / 4246) between the ridge bar (4250) and
eave bar (4226) using corner plates (1092)
(4.7) (4.10).
Loosely connect glazing bars (4241), (4242),
(4243), (4244), (4273) and (4274) between
horizontal bars (4271 / 4272, 4277 / 4278) and
roof corner bars (4239 / 4240, 4245 / 4246)
(4.8) (4.9).
4B. connectinG the roof miDDle
BarS
Now position your greenhouse on the pre-
pared base/foundation and connect loosely.
Position and connect the roof glazing bars
(4254 / 4256) over and to the eave bar (4.15)
(4.16) and ridge bar (4.13) (4.14).
(5900) note : It is necessary to include 2 extra
bolts in the bolt channel in glazing bars (4254)
at this point, to later connect the strengtheners
(4.13).
Loosely connect the gutter bar (4264) to roof
glazing bars (4254 / 4256) (4.15)(5900) (4.18)
(7600) and both roof corner bars (4239 / 4240,
4245 / 4246) (4.11) (4.12).
(5900) Loosely connect roof strengtheners
(4268) underneath glazing bars (4254) (4.16)
(4.17). Insert the extra bolts in (4254) through
the prepared holes (4.16).
(7600) Prepare cropped head bolts (4201) in
the prepared holes in strengtheners (4269)
(4.19). Loosely connect roof strengtheners
(4269) underneath glazing bars (4256) by in-
069.01.1602

Werbung

loading

Diese Anleitung auch für:

Freya 5900