Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 6
EN
1. pleaSe reaD tHeSe inStrUctionS careFUlly anD completely BeFore aSSemBlinG yoUr GreenHoUSe.
2. Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profiles, glass and
polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.
The product you have purchased is intended only for the growing of plants
3.
take no responsibility.
4. It is recommended that this greenhouse is assembled by two people.
5. Should you encounter difficulties constructing this house, or in fitting the glass or polycarbonate sheets, please contact your retailer
– do not use force!
6. The greenhouse must always be anchored.
Site Selection
Always try to select a sunny location, sheltered
from the wind as much as possible.
important
Before assembling your new greenhouse,
please check that all parts in the provided list
are included. Please take each bundle out of
the packaging in order to identify the parts
better.
It is important that the opened bundles do not
get mixed with one another.
If something is missing please contact your
retailer.
nuts (1002) - max. tightening torque 3nm.
neceSSary toolS
Screw drivers (Normal and Crosshead PH2),
10 mm socket spanner or wrench, 10 mm
combination spanner, knife, measuring stick,
spirit level, Accu-drill with adjustable torque.
maintenance
The greenhouse should be thoroughly washed
with a gentle detergent occasionally. Please
check that the detergent used does not react
aggressively with aluminium or the glass fixing
clips.
Ensure that the upper and lower door tracks
are cleaned regularly to avoid a build up of
debris.
0. BaSe
important! The base must be exactly square
and level. A zinc-coated steel base is available
as an accessory for all greenhouse models.
(attention! Only when the greenhouse has to
be located in a very windy and unprotected
location: Drill through both the profile at the
base of the greenhouse and the steel base,
and connect them with nuts and bolts.)
4

Safety Warning

and should only be used for this purpose. When used for other purposes we will
Assembly Instructions
If you would rather construct your own stone
or concrete foundation, please follow the
dimensions specified in diagram 0. Treated
wooden beams at least 18 mm high and not
more then 32 mm wide should be positioned
between the stone/concrete foundation and
the aluminium frame, and connected to the
foundation with 50 mm long bolts (not provi-
ded).
Foundations must extend down below the frost
level.
Diagrams in a single frame show the view
from inside the greenhouse. those enclo-
sed in a double frame show the view from
outside the greenhouse.
1. Front
Lay all of the parts on the floor and connect
them loosely.
Loosely connect the corner plates (1092) on
the upper corners.
2. aSSemBly
Connect the gable end bars (4086 / 4087)
between the eaves door track (4090) (2.1) and
the vertical wall bars (4088 / 4089) (2.3). Now
connect the ridge bar (4052) (2.3) and then sill
bars (1022) (2.4 & 2.5).
Loosely connect the corner plates (1092)
above the eaves (2.1) and at the roof ridge
(2.3).
Connect the side glazing bars (4091 / 4092),
including two extra bolts in each glazing bar.
Connect side braces (4094).
Connect the roof glazing bars (4056) between
the eaves (2.2) and the ridge bar (2.3).
Please use the washers (7395) at all connec-
tion points to eaves door track (4090) (2.1 &
2.2).
It is necessary to include one extra bolt in the
glazing bars (4056) at this point, to later
connect the roof vent.
3. aSSemBly on Wall
Now position your greenhouse on the prepa-
red base/foundation and connect loosely.
Adjust the greenhouse until it is completely
square and tighten all bolts.
please do not over tighten. (max. 3nm)
Ensure that the sides are perfectly vertical.
Note the pre-drilled holes in the vertical wall
bars (4088 / 4089)) and ridge bar (4052) and
mark them on the wall.
Remove the frame from the base.
Drill 6 mm holes in the wall as marked and
place 6mm wall plugs in the wall.
Replace the frame on the base and connect it
to the wall using screws (3.1) & (3.2).
(The wall plugs, screws and drill are not inclu-
ded).
Finally connect the frame to the base.
4l and 4r. DoorS
attention: Do not stand the assembled
door on the door gliders (1014) to avoid
damaging them."
Push the door gliders (1014) onto both ends of
door bar (1360) (4.1).
Assemble the door as shown in diagram 4.
Connect door rollers (1015) to the door bar
(1362) using bolt (1304), washer (1009) and
nut (1007) (4.4).
Bolt door bar (1362) to upper bar (1359) (4.3)
and slide the door seal (3021) into the outside
side bar (4059) (4.5). Slide bolts (1500) into
the bottom of the bolt channel holding brush
seals (3021) and fix it in place using nut (1515)
(4.6). Please ensure that for the inside side
bar, the part (4099) is used on the right in (4R)
and (4098) on the left in (4L).
007.01.1909

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3300

Inhaltsverzeichnis