Check before the installation
To ensure the necessary security and the smooth operation of the actuators, the following preconditions must be checked:
» The installation of the housing of the electronic control units (see relevant instructions) must be performed with such a
distance from the actuators, that the motor cable absolutely doesn't need to be extended.
» For use in masonry or concrete posts, we recommend using chemical anchor bolts or anchor bolts which guarantee a
stress-free mounting.
screws must be fully supported on the inside and outside with metal plates, since otherwise the screws could loosen over
time.
» Check for the smooth and uniform movement of the leafs and make sure that there is no friction or obstructions during
the entire movement.
» Also ensure the perfect condition of the hinges.
» Mechanical stops for the „Gate CLOSED" position must be present.
» If necessary, remove any present locks and stoppers. It is recommended that any blacksmithing be carried out before
mounting the actuators.
After the installation
» The passage between the leafs is prohibited as long as they are in motion. Before passing through the leafs, the full
opening should be awaited.
» The dwelling of persons between the leafs is strictly prohibited.
» The presence of people or the placement of objects in the immediate vicinity of the gate system is prohibited. This espe-
cially applies during the operation.
» There is an increased risk of injury in the immediate vicinity of the posts. Due to the negative leverage effect the safety
switch-off is not limited to 150N in this area.
» The movement of the leafs should not be counteracted deliberately.
» Branches and shrubs may not interfere with the operation of the automatic gate system.
» The systems of the indicator light display should always be functional and clearly visible.
» The leafs should only be moved manually after the disengagement/release has been performed.
» Before attempting any work on the system, the electrical power supply should be disconnected.
personnel is available for technical assistance.
» We recommend performing an operating capability test of the gate system, security devices and accessory equipment at