Herunterladen Inhalt Inhalt Diese Seite drucken

Fluval FX6 Benutzerhandbuch Seite 12

Vorschau ausblenden Andere Handbücher für FX6:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 37
VERY IMPORTANT: You need to know that as soon as the unit is plugged in, it will start, and will immediately go
through its automatic priming sequence.
2. Open the IN & OUT valve levers placing them in the
vertical position.
3. Plug the unit into an electrical outlet.
The electronic automatic priming sequence will begin.
This is what will happen:
E. The pump will run for 1 minute to fill the filter
canister with aquarium water.
F. The pump will stop for 2 minutes to evacuate air
from the filter canister.
G. The pump will start again; it will remain on and
will run continuously until it is unplugged.
This sequence will repeat itself every time the unit is
unplugged and plugged back in.
Every 12 hours the pump will stop for 1 minute to
evacuate any air that may have become trapped inside
the unit.
Aquarium Capacity:
Pump Output:
Mechanical Area (Foam)
Biological Volume:
Filtration Volume:
Filter Circulation*:
Head Height (max.):
Wattages 120V/60Hz:
Wattages 230-240V/50Hz:
*Note: Flow rates were measured with intake and output hoses of the same length and without media.
12
INSTALLATION AND USE
FLUVAL FX SPECIFICATION
250 gallons
700 g/h
217 in.
1 gallon
3.7 gallons
450 g/h
6.9ft
FX4
1,000 liters
2650 l/h
1,400 cm
2
2
3.9 l
14 l
5.28 gallons
1,700 l/h
2.1 m
30W
30W
FX6
400 gallons
1,500 liters
925 g/h
3,500 l/h
325.5 in.
2,100 cm
2
1.5 gallons
5.9 l
20 l
563 g/h
2,130 l/h
10.8ft
3.3 m
43W
41W
2

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Fx4

Inhaltsverzeichnis