Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting The Monitor - Waeco MOBITRONIC M45R Montage- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
_M45.book Seite 31 Freitag, 21. November 2008 11:05 11
M45R
➤ Wind the cable to be connected around the original cable and solder the two cables
together (C).
➤ Insulate the two cables with insulating tape (D).
Proceed as follows to solder two cables together (fig. 6, page 5):
➤ Strip the two cables (A).
➤ Place a shrink sleeve with a length of approx. 20 mm over the cable (B).
➤ Twist the cables together and solder them (C).
➤ Place a shrink sleeve over the soldered point and heat it briefly (D).
7

Mounting the monitor

7.1
Tools required (fig. 1, page 3)
For installation and assembly you will need the following tools:
Measuring ruler (4)
Centre punch (5)
Hammer (6)
Drill bit set (7)
Drill (8)
Screwdriver (9)
To make and test the electrical connection, the following tools are required:
Diode test lamp (1) or voltmeter (2)
Insulating tape (10)
Heat shrinking sleeve
Hot air blower (11)
Crimping tool (12)
Soldering iron (optional) (13)
Solder (optional) (14)
Cable bushing sleeves (optional)
Depending on the individual installation requirements you may require bolts, nuts, wash-
ers, self-tapping screws and cable binders other than those including in the scope of de-
livery.
Mounting the monitor
31

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis