Herunterladen Inhalt Inhalt Diese Seite drucken

Before Starting The Equipment; Operation - EINHELL RT-CD Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Anleitung_RT_CD_10_8_Li_SPK7.qxp:_
GB
Sound and vibration
Sound and vibration values were measured in
accordance with EN 60745.
L
sound pressure level
pA
K
uncertainty
pA
L
sound power level
WA
K
uncertainty
WA
Wear ear-muffs.
The impact of noise can cause damage to hearing.
Total vibration values (vector sum of three directions)
determined in accordance with EN 60745.
Drilling in metal
Vibration emission value a
≤ 2,5 m/s
h
K uncertainty = 1,5 m/s
2
Screwing without hammer action
Vibration emission value a
≤ 2,5 m/s
h
K uncertainty = 1,5 m/s
2
Additional information for electric power tools
Warning!
The specified vibration value was established in
accordance with a standardized testing method. It
may change according to how the electric equipment
is used and may exceed the specified value in
exceptional circumstances.
The specified vibration value can be used to compare
the equipment with other electric power tools.
The specified vibration value can be used for initial
assessment of a harmful effect.
Keep the noise emissions and vibrations to a
minimum.
Only use appliances which are in perfect working
order.
Service and clean the appliance regularly.
Adapt your working style to suit the appliance.
Do not overload the appliance.
Have the appliance serviced whenever
necessary.
Switch the appliance off when it is not in use.
Wear protective gloves.
12
21.06.2011
10:57 Uhr
Residual risks
Even if you use this electric power tool in
accordance with instructions, certain residual
risks cannot be rules out. The following hazards
may arise in connection with the equipment's
construction and layout:
65.3 dB(A)
1. Lung damage if no suitable protective dust mask
3 dB
is used.
2. Damage to hearing if no suitable ear protection is
76.3 dB(A)
used.
3 dB
3. Health damage caused by hand-arm vibrations if
the equipment is used over a prolonged period or
is not properly guided and maintained.

6. Before starting the equipment

Be sure to read the following information before you
use your cordless screwdriver for the first time:
2
1. Charge the battery pack with the charger
supplied. An empty battery pack requires a
charging period of approximately 3 hours.
2. Only ever use sharp drill bits and screwdriver bits
2
which are suitable for the purpose and in
faultless condition.
3. Always check for concealed electric cables and
gas and water pipes when drilling and screwing
in walls.

7. Operation

7.1 Charging the LI battery pack (Fig. 2/3/4)
The battery is protected from exhaustive discharge.
An integrated protective circuit automatically
switches off the equipment when the battery is flat. In
this case the bit chuck will cease to turn.
Warning! Do not press the ON/OFF switch any more
if the protective circuit has actuated. This may
damage the battery.
1. Remove the battery pack (4) from the handle,
pressing the pushlock buttons (5) on the left and
right sides to do so.
2. Check that your mains voltage is the same as
that marked on the rating plate of the battery
charger. Plug the mains plug of the charger (9)
into the mains socket outlet.
3. Connect the charging cable (a) to the charging
adapter (8).
4. The green LED on the charger will come on. Plug
the battery (4) into the charging adapter (8). Now
the red LED will come on to indicate that the
battery pack is being charged. When the charging
period is completed after approx. 3 hours, the red
LED goes out again. The temperature of the
Seite 12

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

45.131.85

Inhaltsverzeichnis