Herunterladen Inhalt Inhalt Diese Seite drucken

Mitsubishi Electric 50 Installationshandbuch Seite 4

Air-conditioners pead
Vorschau ausblenden Andere Handbücher für 50:
Inhaltsverzeichnis

Werbung

6
[Fig. 6-10]
Max. 20m
1.5-2m
B
A
K
B
D
E
F
F
[Fig. 6-11]
I
A
35
32
C
D
B
A Indoor unit
B Tie band (accessory)
C Visible part
D Insertion margin
E Drain hose (accessory)
F Drain pipe (O.D. ø32 PVC TUBE, field supply)
G Insulating material (field supply)
H Tie band (accessory)
I To be gap free. The joint section of the insulation material meet must be at the top.
[Fig. 6-13]
B
F
4
C
L
M
D
D
F
G
I
H
F
E
G
25
D
H
A
E
C
D
6.5
Max. 300mm
N
B
J
F
O
[Fig. 6-12]
A Indoor unit
B Tie band (accessory)
C Band fixing part
D Insertion margin
E Drain hose (accessory)
F Drain pipe (O.D. ø32 PVC TUBE, field supply)
G Insulating material (field supply)
A Insert pump's end 2 to 4 cm.
B Remove the water supply port.
C About 2500 cc
D Water
E Filling port
F Screw
Correct piping
Wrong piping
A Insulation (9 mm or more)
B Downward slope (1/100 or more)
C Support metal
K Air bleeder
L Raised
M Odor trap
Grouped piping
D O. D. ø32 PVC TUBE
E Make it as large as possible. About 10 cm.
F Indoor unit
G Make the piping size large for grouped piping.
H Downward slope (1/100 or more)
I O. D. ø38 PVC TUBE for grouped piping.
(9 mm or more insulation)
PEAD-RP·JAL model
J Up to 550 mm
N Drain hose (accessory)
O Horizontal or slightly upgradient
F
A
E
G
5
25
D
C
B

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

35140jal140ja6071100 ... Alle anzeigen

Inhaltsverzeichnis