Herunterladen Inhalt Inhalt Diese Seite drucken

Overview; Installation; Overhead Rigging - EuroLite LED PAR-36 RGB Audience Blinder Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

OVERVIEW

INSTALLATION

Overhead rigging

Please consider the EN 60598-2-17and the respective national standards during the installation!
The installation must only be carried out by an authorized dealer!
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
DANGER TO LIFE!
19/26
1. Safety Rope Hole
2. Dip Switches
3. Power Supply
4. Power On/Off
5. Fuse
6. Dmx In/Out
7. Sensivity-Control
00049271.DOC, Version 1.1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis