Herunterladen Inhalt Inhalt Diese Seite drucken

Level Meter - Klarstein 10029706 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für 10029706:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step 3: open piping hole
1.
Choose the position of piping hole according to the direction of outlet pipe. The
1.
position of piping hole should be a little lower than the wall-mounted frame, shown as below
Wall
Mark in the middle of it
Space
to the
wall
above
150mm
Left
Φ55
Rear piping hole
2. Open a piping hole with the diameter of 55/70 on the selected outlet pipeposition. In order to drain
smoothly, slant the piping hole on the wall slightly downward to the outdoor side with the gradient
of 5-10°..
Pay attention to dust prevention and take relevant safety measures
when opening the hole.
The plastic expansion particles are not provided and should be
bought locally.

Level meter

Space
to the
above
150mm
Right
Rear piping hole
5-10
Wall
wall
Φ55
Indoor
outdoor
Φ70
48

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

10029700

Inhaltsverzeichnis