Bus connection
With central monitoring via the CGLine bus, bus connection is via the
D1 and D2 terminals, whereby the terminals each exist twice and are bypassed on the device side
to enable through-wiring.
LED-connection
The integrated supply electronics are suitable for the operation of various LED circuit boards. When
switching on for the first time or after the network and battery have been disconnected or after a
reset (test button pressed > 10 s) the electronics detect the circuit board used and set the correct
parameters for operation. This initialisation process requires approx. 5 s.
LEDs are sensitive against ESD, that means against electrostatic discharge. This can already hap-
pen by touching connections. Please take suitable electronic protection measures!!
Only connect in dead-voltage condition!
Battery connection
Commissioning should only be carried out at temperatures within the specified range. Charging of
the batteries at excessive or insufficient temperatures may damage batteries and is therefore pre-
vented by the electronics. This is shown by red flashing at the test button.
To fathom batteries life please note the start-up date on the battery in the given data field!
Button/LED-foil-connection
Changing button/LED or printed circuit please see marker 1 on the printed circuit board and on
the printed conductor!
Operating Instructions
GuideLed self contained luminaire
SL 13811 ... 13822 CGLine
CEAG Notlichtsysteme GmbH
5

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis