Herunterladen Inhalt Inhalt Diese Seite drucken

Batteries Installation - TFA 98.1009 Bedienungsanleitung

Funkgesteuerte projektions-uhr mit digital-thermometer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
SETTING UP:
The Projection clock can be batteries operated or powered by the provided AC/DC adapter.

BATTERIES INSTALLATION

1.
Open the battery cover at the back of the projection clock as indicated above.
2.
Checking the correct polarization, insert 2 x AA, IEC LR6, 1.5V Alkaline batteries into the battery
compartment and replace the cover.
When the batteries are inserted, all the segments of the LCD will light up briefly and a "beep" will
3.
sound. the Projection clock will now start receiving the DCF time signal. After approximate 3 to 5
minutes, the DCF time will be displayed.
4.
If reception is not successful within approximately 7-10 minutes, the PRojection clock will attempt to
receive the signal in the next following hour.
Your projection clock is now operational.
Note:
If the batteries are used as the main power source:
1.
Projected image brightness, alarm volume and back-light strength would be weaker.
Battery
compartment
Battery cover
28

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis