Herunterladen Diese Seite drucken

Installation - Heatscope LIFT Montage- Und Gebrauchsanleitung

Elektrische hubsteuerung exklusiv für heatscope infrarot ambiente- & power-strahler

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation

HEATSCOPE® infrared heaters must be installed and executed
only by an authorized expert / professional electrician.
Turn off /drive out fuse.
1.
The control unit in the plastic box (MHS-VS-LFT-C1 //
MHS-VS-LIFT-C1) must not be placed in the ceiling recess
diretcly due to the lack of space. But it must be placed right
next to the ceiling recess for the HEATSCOPE® heater
(eventually in an extra recess).
Please connect cables with the ceiling recess acc. to the
installation drawings above. Mount the LIFT control unit box
next to the ceiling recess inside the ceiling, in an extra recess
or inside the dropped ceiling.
2.
Screw the mounting panel horizontal and vertical centered
in the ceiling recess.
3.
Bolt the LIFT on the mounting panel. Wire the LIFT control unit
box acc. to wiring diagramm of this manual AND acc. to the
HEATSCOPE® model type you want to install.
C
Turn on/drive in fuse.
4.
LIFT is driving down automatically.
Die Montagehalterung sind nur mit
ausgefahrene Hub festzuschrauben!
Turn off /drive out fuse again immediately.
5.
Slide HEATSCOPE® heater on the installation panel of the LIFT.
You may adjust the heater parallel to the floor with the adjustable
screws on the right and on the left side of the LIFT. CAUTION: The
D
adjustable screws are only adjustment possibilities for the
HEATSCOPE® – under no circumstances you should use these to
lower the heater out of the recess more and more, because in this
case the functionality may be harmed and it may damage and
overheat the heater.
6.
Connect HEATSCOPE® heater with LIFT control unit acc. to the wiring
diagram of this manual AND acc. to the HEATSCOPE® model type you want to install.
Finally turn on/drive in fuse again.
7.
The control unit is driving back the HEATSCOPE® in the recess automatically.
8.
LIFT is now fully operational: As soon as HEATSCOPE® is tunred on, LIFT will drive down automatically.
If the heater will be turned off again, the control unit is driving back LIFT automatically in the recess after 180 sec.
5
Tel.: +49 8104 647090 · Fax: +49 8104 647099 · E-Mail: mail@munich-home-systems.de · www.munich-home-systems.de
d nur mit
Allgemeintoleranzen
Werkstückkanten
DIN ISO 2768 T1 - m
siehe
DIN ISO 2768 T2 - K
Zeichnung
Bearb.
19.04.2016
Gepr.
04.08.2016
Norm
Zust.
Revision
Datum
Name
Urspr.:
2
3
A (1 : 1)
4
C (1 : 1)
A (1 : 1)
A
C (1 : 1)
B
D (1 : 1)
© nach DIN ISO 16016
MHS - Munich Home Systems GmbH, Sauerlach (Germany) 2016
Oberfläche
Material
Masse
EN 12020-2
Behandlung
Abmessungen
Beschreibung
Datum
Name
Ceiling Box with lifting device for Heatscope
D.Meneghin
VISION 230 VAC, 2200 W /
R.Meßmer
Hubvorrichtung für Heatscope VISION 230 VAC,
2200 W_Explosionzeichnung für
Bedienungsanleitung_
Zeichnungsnummer
2016.002.003
Ers.f.:
Ers.d.:
1
6
A M B I E N T H E A T I N G S O L U T I O N S
D (1 : 1)
C
Die Montagehalterung sind nur mit
ausgefahrene Hub festzuschrauben!
B (1 : 1)
D
Maßstab
1:7
Blattgröße
A3
Blatt
1/1
7
© nach DIN ISO 16016
MHS - Munich Home Systems GmbH, Sauerlach (Germany) 2016
A
C
B
D
Mounting trays are only
installable when Lift is
driven out!
Allgemeintoleranzen
DIN ISO 2768 T1 - m
DIN ISO 2768 T2 - K
Zust.
Revision
Datum
Name
EN

Werbung

loading