Herunterladen Inhalt Inhalt Diese Seite drucken

EuroLite Superstrobe 2700 Bedienungsanleitung Seite 16

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The strobe should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the strobe. If you lack these qualifications, do not attempt the installation yourself,
but instead use a professional structural rigger. Improper installation can result in bodily injury and.or
damage to property.
The strobe has to be installed out of the reach of people.
If the strobe shall be lowered from the ceiling or high joists, professional trussing systems have to be used.
The strobe must never be fixed swinging freely in the room.
Caution: Strobes may cause severe injuries when crashing down! If you have doubts concerning the safety
of a possible installation, do NOT install the strobe!
Before rigging make sure that the installation area can hold a minimum point load of 10 times the strobe's
weight.
When installing the device, make sure there is no highly-inflammable
material (decoration articles, etc.) within a distance of min. 0.5 m.
Mount the strobe with the mounting-bracket to your trussing system using an appropriate clamp. The hole in
the mounting bracket has a diameter of 10 mm.
For overhead use, always install an appropriate safety bond.
You must only use safety bonds complying with DIN 56927, quick links complying with DIN 56927, shackles
complying with DIN EN 1677-1 and BGV C1 carbines. The safety bonds, quick links, shackles and the
carbines must be sufficiently dimensioned and used correctly in accordance with the latest industrial safety
regulations (e. g. BGV C1, BGI 810-3).
Please note: for overhead rigging in public or industrial areas, a series of safety instructions have to be
followed that this manual can only give in part. The operator must therefore inform himself on the current
safety instructions and consider them.
The manufacturer cannot be made liable for damages caused by incorrect installations or insufficient safety
precautions!
Pull the safety bond through the attachment eyelet and over the trussing system or a safe fixation spot.
Insert the end in the quick link and tighten the safety screw.
The maximum drop distance must never exceed 20 cm.
A safety bond which already hold the strain of a crash or which is defective must not be used again.
Adjust the desired inclination-angle via the mounting-bracket and tighten the fixation screws.
Connect the fixture to the mains with the power-plug.
DANGER OF FIRE!
16/35
00027070.DOC, Version 3.2

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis