Execution:
1. Carefully flush the pipeline
2. The flow direction of the meter must match the main flow direction of the pipe-
line
3. Check the required installation position of the meter.
The meter has now been correctly installed in the pipeline.
42
RUBIN HYZ ST, RUBIN HYZ RS