Herunterladen Inhalt Inhalt Diese Seite drucken

Integra RUBIN HYZ Montage- Und Bedienungsanleitung Seite 41

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

• Media temperature during operation: maximum of 50°C.
• Media temperature during downtime: maximum of 70°C.
• Ambient temperature between 5°C and 70°C.
• Considerable to strong vibrations and shocks.
3.1 Connection to pipeline
NOTICE
Formation of air bubbles in the meter results in incorrect measurements
• Do not install the meter at the highest point in the pipeline.
• During operation, the pipeline must always be fully filled.
NOTICE
Incorrect installation position may result in incorrect measurements
Comply with the specified installation position.
Facing upwards or to the side
NOTICE
Property damage due to pressure shocks in the pipeline
• When installing the meter, ensure that the meter is not subjected to any
pressure shocks within the pipeline.
NOTICE
Property damage as a result of water leaks due to used seals.
• When installing the meter, ensure that the meter is not subjected to any
pressure shocks within the pipeline.
NOTE
For a smooth installation, comply with the following measures:
• Do not abruptly reduce/increase the pipeline cross-section before and
after the meter.
• No inlet and outlet sections required (U0D0).
• Changes in the cross-section should be concentric at an angle of <8°.
• Use thread seals such as sealing compound suitable for potable water,
hemp or teflon.
• Install flow regulators after the meter in the flow direction.
RUBIN HYZ ST, RUBIN HYZ RS
Meter head
Pipeline
Horizontal
Vertical
41

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rubin hyz stRubin hyz rs

Inhaltsverzeichnis