Herunterladen Diese Seite drucken

janitza UMG 96 RM Installationsanleitung Seite 9

Vorschau ausblenden Andere Handbücher für UMG 96 RM:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Device short description
Device short description
3
3
Voltage measurement connection variants
Voltage measurement connection variants
7
7
The UMG 96 RM is a multi-functional network
The UMG 96 RM is a multi-functional network
analyser, which:
analyser, which:
3p 4w
3p 4w
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
• Measures and calculates electrical
• Measures and calculates electrical
(Addr. 509 = 0, standard setting)
(Addr. 509 = 0, standard setting)
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
variables such as voltage, current,
variables such as voltage, current,
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
frequency, power, energy, harmonics
frequency, power, energy, harmonics
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
N
N
N
N
N
N
N
N
N
N
(up to the 40th harmonic), etc. in building
(up to the 40th harmonic), etc. in building
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
installations, on distribution units, circuit
installations, on distribution units, circuit
N
N
N
N
N
N
N
N
N
N
breakers and busbar trunking systems.
breakers and busbar trunking systems.
• displays and saves measurement results
• displays and saves measurement results
and transmits them via interfaces.
and transmits them via interfaces.
3
V
V1
V2
V1
V3
V2
V
V3
V
V1
V2
N
V1
V3
V2
V1
V
N
V2
V3
V1
V
V3
N
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V1
V3
V2
N
V
V1
V3
N
N
N
N
V
V2
V1
V3
V2
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
N
V1
N
V2
V1
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
N
N
N
N
Measurement with 3 phase
Measurement with 3 phase
conductors and neutral conductor.
conductors and neutral conductor.
or
h
1p 2w1
1p 2w1
(Addr. 509 = 4)
(Addr. 509 = 4)
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
ase
L2
L2
L2
L2
L2
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L3
L3
L3
L3
L3
stem
L2
L2
L2
L2
L2
N
N
N
N
N
N
N
N
N
N
L3
L3
L3
L3
L3
r-
N
N
N
N
N
N
N
N
N
N
3
V
V1
V2
V1
V3
V2
V
V3
V
V1
V2
N
V1
V3
V2
V1
V
N
V3
V2
V1
V
V3
C
N
V2
V
N
V1
V3
C
V2
V
N
V1
V3
V2
N
V
V1
N
V3
V2
N
V
V1
N
V3
NOTE!
NOTE!
Measured values derived from
Measured values derived from
System with equal loading of the
For further information on device functions, data and assembly, see the user manual.
For further information on device functions, data and assembly, see the user manual.
V2
V
V1
V3
V2
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
N
V1
N
V2
V1
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
voltage measurement inputs V2
N
voltage measurement inputs V2
N
N
N
phases. The measured values of
and V3 are taken to be 0 and are
and V3 are taken to be 0 and are
the voltage measurement input V2
not calculated.
not calculated.
Connection variants for current measurement I1, I2, I3
Connection variants for current measurement I1, I2, I3
9
9
t
12
12
Programming the current transformer
Programming the current transformer
3p 2i
3p 2i
(Addr. 510 = 1)
(Addr. 510 = 1)
L1
L1
L1
L1
L1
1. Switch to programming mode.
L1
L1
1. Switch to programming mode.
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
L2
L2
2. The symbols for programming mode PRG
2. The symbols for programming mode PRG
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
and for the current transformer CT appear.
and for the current transformer CT appear.
L3
L3
L3
L3
L3
L3
L3
L3
N
N
N
N
N
N
N
N
3. Press button 1 - the first digit of the input
3. Press button 1 - the first digit of the input
N
N
N
N
N
N
field for the primary current flashes.
field for the primary current flashes.
4. Use button 2 to select the value for the
4. Use button 2 to select the value for the
1st digit.
1st digit.
5. Use button 1 to move to the 2nd. digit.
5. Use button 1 to move to the 2nd. digit.
1
2
I1
I3
I3
I2
I3
I1
I1
I2
I1
I2
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
6. Use button 2 to select the value of the
6. Use button 2 to select the value of the
I1
I2
I1
I3
I2
I3
I1
2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I3
I3
I2
I3
2
2nd digit.
2nd digit.
System with equal loading of the
System with equal loading of the
The measured values for current
3
7. Use button 1 to move to the 3rd digit.
7. Use button 1 to move to the 3rd digit.
phases. The measured values for
phases. The measured values for
current measurement input I2 are
current measurement input I2 are
8. Use button 2 to select the value of the
8. Use button 2 to select the value of the
calculated.
calculated.
3rd digit.
3rd digit.
9. Confirm with button 1.
9. Confirm with button 1.
2p 4w
2p 4w
10. The complete number flashes.
10. The complete number flashes.
(Addr. 510 = 5)
(Addr. 510 = 5)
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
11. Use button 2 to select the decimal place and
11. Use button 2 to select the decimal place and
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
L2
thus the unit of the primary current.
thus the unit of the primary current.
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L3
L2
L2
L2
L2
L2
12. Confirm with button 1.
12. Confirm with button 1.
L3
L3
L3
L3
L3
L3
L2
L2
L2
N
N
N
N
N
N
N
N
13. The input range of the secondary current
13. The input range of the secondary current
N
N
N
N
N
N
flashes.
flashes.
14. Use button 2 to set the secondary current
14. Use button 2 to set the secondary current
(value 1 A or 5 A).
(value 1 A or 5 A).
15. Confirm with button 1.
15. Confirm with button 1.
I2
I1
I3
I3
I2
I3
I1
I1
I2
I2
I1
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
16. Pressing buttons 1 and 2 simultaneously
16. Pressing buttons 1 and 2 simultaneously
2
I2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
System with equal loading of the
System with equal loading of the
Measured values derived from
(1. sec.) exits the programming mode.
(1. sec.) exits the programming mode.
phases. The measured values for
phases. The measured values for
current measurement input I3
current measurement input I2 are
current measurement input I2 are
are taken to be 0 and are not
Use button 2 to change to the input field for
Use button 2 to change to the input field for
calculated.
calculated.
the voltage transformer.
the voltage transformer.
Assembly
Assembly
Install the UMG 96 RM in the weatherproof front
Install the UMG 96 RM in the weatherproof front
panel of switch cabinets.
panel of switch cabinets.
3p 4wu
3p 4wu
3p 4u
3p 4u
L1
L1
L1
L1
L1
L1
L1
L1
L1
(Addr. 509 = 1)
(Addr. 509 = 1)
(Addr. 509 = 2)
(Addr. 509 = 2)
L2
L2
L2
L2
L2
L2
L2
L2
L2
Cut-out size:
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L3
L3
L3
L3
L3
L3
L3
L3
L3
92
+0.8
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
N
N
N
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
Ensure!
N
N
N
Adequate ventilation
• install the device vertically!
• adhere to clearances from
V1
V2
V1
V3
V2
V
V3
V
V2
V1
V
N
V3
V2
V1
V3
V
N
V2
V
V3
V1
V2
V
V1
V3
V2
N
V1
V
V3
V2
N
V1
V
V3
V2
V1
V
N
V2
V3
V1
N
N
N
N
neighbouring components!
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
V
V3
V
V1
N
V2
V1
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
V1
N
V2
V1
N
N
N
N
Measurement via voltage
Measurement via voltage
Measurement with 3 phase
Measurement with 3 phase
transformer with 3 phase
transformer with 3 phase
conductors without neutral
conductors without neutral
Fig. Installation situation,
conductors and a neutral
conductors and a neutral
conductor. Measured values which
conductor. Measured values which
rear view UMG 96
conductor.
conductor.
require an N, use a calculated N.
require an N, use a calculated N.
conductor. Measured values which
m
m
2p 4w
2p 4w
1p 2w
1p 2w
Damage to property due to
Damage to property due to
(Addr. 509 = 3)
(Addr. 509 = 3)
(Addr. 509 = 6)
(Addr. 509 = 6)
disregard of the installation
disregard of the installation
L1
L1
L1
L1
L1
L1
L1
L1
L1
instructions
instructions
CAUTION!
CAUTION!
L2
L2
L2
L1
L1
L1
L1
L1
L1
L1
L1
Failing to observe the installation instructions
Failing to observe the installation instructions
L1
L1
L2
L2
L3
L3
L3
L2
L2
L2
L2
L2
L2
L2
L2
can damage or destroy your device.
can damage or destroy your device.
N
N
N
L3
L3
L2
L3
L2
L3
L2
L2
L2
L2
Ensure that there is adequate air circulation in your
Ensure that there is adequate air circulation in your
L1
L2
N
N
N
installation environment; if the ambient temperatures
installation environment; if the ambient temperatures
L3
are high, ensure there is adequate cooling if required.
are high, ensure there is adequate cooling if required.
L1
L2
L3
V1
V2
V1
V3
V2
V
V3
V
V2
V1
V
N
V3
V2
V1
V
V3
N
V2
V
N
V3
V1
V2
V
N
V1
V3
V2
N
V1
V
N
V3
V2
N
V
V1
N
V3
V2
V1
V
N
V3
V2
V1
N
System with equal loading of the
TN-C system with 1-phase, three-
TN-C system with 1-phase, three-
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
V
V3
V
V1
N
V2
V1
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
V1
N
V2
V1
phases. The measured values of
N
N
conductor connection. Measured
conductor connection. Measured
N
N
the phases. The measured values
the voltage measurement input V2
values derived from voltage
values derived from voltage
for the phases that are not created
are calculated.
are calculated.
measurement input V3 are taken
measurement input V3 are taken
to be 0 and are not calculated.
to be 0 and are not calculated.
3p 2i0
3p 2i0
3p 3w3
3p 3w3
(Addr. 510 = 2)
(Addr. 510 = 2)
(Addr. 510 = 3)
(Addr. 510 = 3)
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
I2
I2
I1
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
I2
I2
I1
I1
I1
I3
I3
I2
I2
I2
I1
I3
I1
I3
I3
I2
I2
I2
I1
I3
I2
I3
I1
I2
I1
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
Fig. "Current transformer" input area
Fig. "Current transformer" input area
The measured values for current
Measurement in the 3-phase
Measurement in the 3-phase
measurement input I2 are
measurement input I2 are
network with unequal loading.
network with unequal loading.
C
C
calculated.
calculated.
The measured values for current
NOTE!
NOTE!
measurement inputs I2 and I3 are
• Changes are only applied after exiting
• Changes are only applied after exiting
programming mode.
programming mode.
1p 2i
1p 2i
1p 2w
1p 2w
• For further information on current
• For further information on current
(Addr. 510 = 6)
(Addr. 510 = 6)
(Addr. 510 = 7)
(Addr. 510 = 7)
L1
L1
L1
L1
L1
L1
L1
L1
transformers and current transformer
L1
L1
transformers and current transformer
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
ratios, see the user manual.
ratios, see the user manual.
L2
L2
L2
L2
L2
L2
N
N
N
N
N
N
N
N
N
N
N
N
N
N
I2
I1
I2
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
I2
I2
I1
I1
I1
I3
I3
I2
I2
I2
I1
I3
I1
I3
I3
I2
I2
I2
I1
I1
I3
I2
I2
I1
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I1
I3
I3
I2
I2
Measured values derived from
Measured values derived from
Measured values derived from
3 systems with equal loading of
current measurement input I3
current measurement inputs I2 and
current measurement inputs I2 and
the phases. The measured values
are taken to be 0 and are not
I3 are taken to be 0 and are not
I3 are taken to be 0 and are not
for the phases that are not created
calculated.
calculated.
calculated.
calculated.
relevant systems are calculated.
Connecting the supply voltage
4
4
Current measurement I1, I2, I3
8
8
The supply voltage level for your device is specified
on the rating plate.
The device
3p 2u
3p 2u
L1
L1
L1
L1
L1
L1
L1
L1
L1
After connecting the supply voltage, an indication
• is only approved for measuring current with a
(Addr. 509 = 5)
(Addr. 509 = 5)
L2
L2
L2
L2
L2
L2
L2
L2
L2
Cut-out size:
is shown on the display. If no indication appears,
L1
L1
L1
L1
L1
L1
L1
L1
L1
L3
L3
L3
L3
L3
L3
L3
L3
L3
x 92
92
+0.8
+0.8
x 92
mm
+0.8
mm
check whether the supply voltage is within the
L2
L2
L2
• is intended for connecting current
L2
L2
L2
L2
L2
L2
rated voltage range.
L3
L3
L3
L3
L3
L3
L3
L3
L3
Ensure!
L
Adequate ventilation
• has the current transformer ratio 5/5 A set as
N
• install the device vertically!
• adhere to clearances from
V1
V2
V1
V3
V2
V
V3
V
V
V3
N
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V1
V3
V2
N
V
V1
V3
V2
V1
V
N
V3
V2
V1
V
V3
N
V2
V
V3
V1
N
N
N
N
N
neighbouring components!
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
V
V3
V
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
V1
N
V2
V1
N
V3
V2
V
V1
V3
N
N
N
N
N
Measurement via voltage
Measurement via voltage
transformer with 3 phase
transformer with 3 phase
Fig. Installation situation,
conductors without neutral
conductors without neutral
rear view UMG 96
conductor. Measured values which
require an N, use a calculated N.
require an N, use a calculated N.
WARNING!
Fig. Connecting supply voltage.
3p 1w
3p 1w
Serious bodily injury or death can result from:
(Addr. 509 = 7)
(Addr. 509 = 7)
• Contact with bare or stripped live wires.
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
• Current measurement inputs that are
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
L2
L2
WARNING!
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L3
L3
L2
L2
L3
L3
L3
L3
L3
De-energise your device before starting
L1
L1
L1
L1
L1
L1
L1
Serious bodily injury or death can result from:
L1
L1
L1
L1
L2
L2
L2
L1
L1
L1
L2
L2
L2
work! Check that it is de-energised.
L2
• Contact with bare or stripped live wires.
L2
L2
L3
L3
L2
L3
L2
L2
L2
L2
L3
L3
L3
L3
L1
L1
L1
L1
L3
L3
Earth the system. Use the earth connection
L3
L3
L3
L3
L3
L1
L1
L1
• Device inputs that are dangerous to touch.
L1
L1
L1
L1
N
N
L2
L2
N
N
N
N
L2
L2
N
L2
L2
L2
points with earthing symbols for this!
L2
L2
L2
L2
De-energise your device before starting
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
Earth the secondary windings of current
V3
V
N
V2
V1
V
N
V3
V1
V2
V1
V
V2
N
V1
V3
V2
V3
V2
V
N
V3
V
V1
N
V3
V
V2
N
V
V1
N
V3
V2
V
V3
V
V1
N
V2
V1
V3
N
V2
V
N
V3
V1
work! Check that it is de-energised.
N
N
N
N
N
N
N
N
N
N
N
transformers and all of the metal parts of
3 systems with equal loading of
3 systems with equal loading of
N
V3
V2
V1
V
V1
V3
V2
V1
V2
V
V1
V3
V2
V3
V2
V
V3
V1
V
V3
V
V2
V1
V
V3
V2
V
V3
V
the phases. The measured values
N
N
N
N
N
N
V1
N
V2
V1
N
V3
V2
V
V1
N
V3
the transformer that could be touched!
for the phases that are not created
(L2/L3, L1/L3, L1/L2) for the
(L2/L3, L1/L3, L1/L2) for the
relevant systems are calculated.
relevant systems are calculated.
I1
I2
I1
I3
I2
I3
I1
I2
I1
I3
Establish the connection to the PC
10
10
13
13
Programming voltage transformers
The most common connections for
3p 3w
3p 3w
communication between the PC and the device:
(Addr. 510 = 4)
(Addr. 510 = 4)
1. Switch to programming mode.
Current transformer,
Current transformer,
primary
L1
primary
L1
L1
L1
2. The symbols for programming mode PRG
L2
L2
L2
L2
Programming mode
Programming mode
1.
1.
L3
L3
L3
L3
3. Use button 2 to change to programming
Unit indicator
Unit indicator
N
N
N
N
Connection of the UMG 96 RM
Current transformer,
Current transformer,
4. The symbols for Programming mode PRG,
via interface converter.
secondary
secondary
Current transformer
Current transformer
symbol
symbol
5. Press button 1 to confirm - the first digit
2.
2.
I1
I3
I3
I2
I3
I1
I3
I3
I2
I1
I3
I2
I1
I3
I2
I3
I1
I2
I1
I3
Measurement in the 3-phase
Measurement in the 3-phase
6. Use button 2 to select the value of the
network with equal loading.
network with equal loading.
The measured values for current
Connection of the UMG 96 RM
measurement inputs I2 and I3 are
via a UMG 604 as a gateway.
calculated.
calculated.
7. Use button 1 to move to the 2nd. digit.
8. Use button 2 to select the value of the
3p 1w
3p 1w
(Addr. 510 = 8)
(Addr. 510 = 8)
More details on device configuration and
L1
L1
L1
L1
L1
L1
L1
L1
9. Use button 1 to move to the 3rd digit.
communication can be found from section 11.
L2
L1
L2
L2
L1
L2
L2
L1
L2
L1
L2
L1
L1
L2
10. Use button 2 to select the value of the
L3
L2
L3
L3
L2
L3
L3
L3
L3
L3
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L1
L1
L1
L1
L1
L1
L1
L1
L2
L1
L2
L2
L1
L2
L2
L1
L2
L1
L2
L1
L1
L2
11. Confirm with button 1.
L3
L2
L3
L3
L2
L3
L3
L3
L3
L3
L2
L2
L2
L2
L3
L3
L1
L1
L1
L1
L1
L3
L1
L3
L1
L3
L3
L1
12. The complete number flashes.
L2
L1
L2
L2
L1
L2
L2
L1
L2
L1
L1
L2
L2
L1
13. Use button 2 to select the decimal place and
CAUTION!
L3
L2
L3
L3
L2
L3
L3
L3
L3
L3
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
Incorrect network settings can cause faults in
14. Confirm with button 1.
the IT network!
I1
I3
I3
I2
I1
I1
I3
I2
I2
I1
I1
I1
I3
I3
I2
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
15. The input range of the secondary voltage
I1
I3
I3
I2
I1
I3
I2
I1
I1
I3
I2
I2
I1
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
Obtain information from your network
3 systems with equal loading of
administrator about the correct Ethernet
the phases. The measured values
for the phases that are not created
16. Set the secondary voltage with button 2.
network settings for your device.
(L2/L3, L1/L3, L1/L2) for the
(L2/L3, L1/L3, L1/L2) for the
relevant systems are calculated.
9 / 12
Connecting the supply voltage
Current measurement I1, I2, I3
The supply voltage level for your device is specified
on the rating plate.
The device
L1
After connecting the supply voltage, an indication
• is only approved for measuring current with a
L2
is shown on the display. If no indication appears,
current transformer.
current transformer.
L3
check whether the supply voltage is within the
• is intended for connecting current
rated voltage range.
transformers with secondary currents of
transformers with secondary currents of
../1 A and ../5 A.
../1 A and ../5 A.
L
• has the current transformer ratio 5/5 A set as
N
standard.
standard.
Fuse
Fuse
V2
V
V1
V3
V2
V
V3
V
N
N
N
Circuit breaker
Circuit breaker
V2
V
V1
V3
V2
V
V3
V
N
N
N
c
c
Risk of injury due
Risk of injury due
to electric voltage!
to electric voltage!
WARNING!
Fig. Connecting supply voltage.
Serious bodily injury or death can result from:
• Contact with bare or stripped live wires.
L1
c
c
• Current measurement inputs that are
L2
Risk of injury due
Risk of injury due
L3
dangerous to touch on the device and on
dangerous to touch on the device and on
to electric voltage!
to electric voltage!
L1
the current transformers.
the current transformers.
WARNING!
L2
L3
De-energise your device before starting
Serious bodily injury or death can result from:
L1
work! Check that it is de-energised.
• Contact with bare or stripped live wires.
L2
L1
L1
Earth the system. Use the earth connection
L3
• Device inputs that are dangerous to touch.
N
L2
L2
points with earthing symbols for this!
De-energise your device before starting
L3
L3
Earth the secondary windings of current
V2
V
N
V1
work! Check that it is de-energised.
V3
V2
V
N
V3
V
N
transformers and all of the metal parts of
V2
V
V1
N
V3
V2
V
N
V3
V
N
the transformer that could be touched!
I2
I3
I1
I2
I1
I3
I2
I3
Establish the connection to the PC
Programming voltage transformers
The most common connections for
communication between the PC and the device:
1. Switch to programming mode.
L1
L1
2. The symbols for programming mode PRG
and for the current transformer CT appear.
and for the current transformer CT appear.
RS232
RS232
RS232
RS232
RS485
RS485
PC
PC
L2
L2
UMG 96 RM
UMG 96 RM
3. Use button 2 to change to programming
RS485
RS485
mode for the voltage transformer.
mode for the voltage transformer.
Connection of the UMG 96 RM
4. The symbols for Programming mode PRG,
RS485
RS485
UMG 96 RM
UMG 96 RM
via interface converter.
and for the voltage transformer VT appear.
and for the voltage transformer VT appear.
5. Press button 1 to confirm - the first digit
of the input area for the primary voltage
of the input area for the primary voltage
I2
I3
Ethernet
Ethernet
I1
I2
I1
I3
I2
I3
RS485
RS485
PC
PC
UMG 604
UMG 604
UMG 96 RM
UMG 96 RM
flashes.
flashes.
6. Use button 2 to select the value of the
Connection of the UMG 96 RM
1st. digit.
1st. digit.
RS485
RS485
UMG 96 RM
UMG 96 RM
via a UMG 604 as a gateway.
7. Use button 1 to move to the 2nd. digit.
8. Use button 2 to select the value of the
2nd digit.
2nd digit.
More details on device configuration and
9. Use button 1 to move to the 3rd digit.
communication can be found from section 11.
10. Use button 2 to select the value of the
3rd digit.
3rd digit.
m
m
11. Confirm with button 1.
Damage to property due to
Damage to property due to
12. The complete number flashes.
incorrect network settings
incorrect network settings
13. Use button 2 to select the decimal place and
CAUTION!
(gedrehtes Patchkabel)
(gedrehtes Patchkabel)
thus the unit of the primary voltage.
Incorrect network settings can cause faults in
thus the unit of the primary voltage.
(gedrehtes Patchkabel)
(gedrehtes Patchkabel)
14. Confirm with button 1.
the IT network!
15. The input range of the secondary voltage
Obtain information from your network
flashes.
administrator about the correct Ethernet
flashes.
16. Set the secondary voltage with button 2.
network settings for your device.
Connection variant 3p 4w current measurement
Connection variant 3p 4w current measurement
Damage to property due to
Damage to property due to
m
m
(I1, I2, I3) via current transformer (Addr. 510 = 0,
(I1, I2, I3) via current transformer (Addr. 510 = 0,
disregard of the connection
disregard of the connection
standard setting).
standard setting).
conditions or impermissible
conditions or impermissible
L1
L1
L1
L1
L1
L1
L1
L1
CAUTION!
CAUTION!
voltage swells
voltage swells
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L3
Your device can be damaged or destroyed
Your device can be damaged or destroyed
L3
L3
L3
L3
L3
L3
N
N
N
N
N
N
N
N
by a failure to comply with the connection
by a failure to comply with the connection
N
N
N
N
N
N
conditions or by exceeding the permissible
conditions or by exceeding the permissible
voltage range.
voltage range.
Before connecting the device to the supply
Before connecting the device to the supply
voltage, please check:
voltage, please check:
Load
Load
L1
I1
I1
I2
I1
I2
I1
I1
I3
I3
I2
I2
I2
I1
I3
I1
I3
I3
• Voltage and frequency correspond to the
• Voltage and frequency correspond to the
I1
I2
I1
I3
I2
I3
I1
I2
I1
I1
I3
L2
details on the ratings plate! Threshold
details on the ratings plate! Threshold
L3
values stipulated in the user manual
values stipulated in the user manual
N
have been complied with!
have been complied with!
C
C
• In building installations, the supply
• In building installations, the supply
NOTE!
NOTE!
voltage must be protected with a UL/IEC
voltage must be protected with a UL/IEC
With measurement range exceeding,
With measurement range exceeding,
approved circuit breaker / a fuse!
approved circuit breaker / a fuse!
the measurement device display shows
the measurement device display shows
L1
L1
L1
L1
L1
L1
L1
• The circuit breaker
• The circuit breaker
"EEE". Further information on this can
"EEE". Further information on this can
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
- must be easily accessible for the user
- must be easily accessible for the user
be found in the user manual.
be found in the user manual.
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
and be installed close to the device.
and be installed close to the device.
L3
L3
L3
L3
L3
N
N
N
N
N
N
N
c
c
- must be labelled for the relevant device.
- must be labelled for the relevant device.
Risk of injury due to
Risk of injury due to
N
N
N
N
N
• Do not connect the supply voltage to the
• Do not connect the supply voltage to the
large currents and high
large currents and high
voltage transformers.
voltage transformers.
L1
L1
electric voltages!
electric voltages!
WARNING!
WARNING!
• Provide a fuse for the neutral conductor
• Provide a fuse for the neutral conductor
L2
L2
Current transformers operating with an open
Current transformers operating with an open
if the source's neutral conductor
if the source's neutral conductor
L3
L3
I1
I1
I2
I2
I1
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
secondary circuit (high voltage peaks) can
secondary circuit (high voltage peaks) can
connection is not earthed.
connection is not earthed.
I1
I2
I1
I3
I2
I3
I1
I2
I1
I1
result in serious or even fatal injuries.
result in serious or even fatal injuries.
Avoid open operation of the current transformers -
Avoid open operation of the current transformers -
short-circuit unloaded transformers!
short-circuit unloaded transformers!
I1
I2
I1
I3
I2
I3
17. Confirm with button 1.
17. Confirm with button 1.
L1
L1
L1
L1
18. Pressing buttons 1 and 2 simultaneously
18. Pressing buttons 1 and 2 simultaneously
L2
L2
(1. sec.) exits the programming mode. Use
(1. sec.) exits the programming mode. Use
L3
L3
L1
L1
button 2 to change to the programming
button 2 to change to the programming
L2
L2
N
N
mode for the parameter list.
mode for the parameter list.
L3
L3
L1
L1
L2
L2
L3
L3
Voltage transformer,
Voltage transformer,
primary
primary
I1
I2
I1
I3
I2
I3
I1
I2
I1
I3
I2
I3
Programming mode
Programming mode
Unit indicator
Unit indicator
Voltage transformer,
Voltage transformer,
secondary
secondary
Voltage transformer
Voltage transformer
symbol
symbol
Fig. Rear side UMG 96 RM
Fig. Rear side UMG 96 RM
Fig. "Voltage transformer" input area
Fig. "Voltage transformer" input area
C
C
NOTE!
NOTE!
• Changes are only applied after exiting
• Changes are only applied after exiting
programming mode.
programming mode.
• Further information on voltage trans-
• Further information on voltage trans-
formers and voltage transformer ra-
formers and voltage transformer ra-
tios can be found in the user manual.
tios can be found in the user manual.
9
L1
L1
L1
L1
L
L2
L2
L2
L2
L
L3
L3
L3
L3
L
N
N
N
N
N
L1
I2
I2
I1
I3
I3
I2
I3
I1
I1
I1
I2
I2
I1
I3
I3
I2
I3
L2
L3
N
L1
L1
L1
L
L1
L1
L2
L2
L2
L
L2
L2
L3
L3
L3
L
L3
L3
N
N
N
N
N
N
I2
I2
I1
I3
I3
I2
I3
I1
I1
I1
I3
I2
I2
I1
I3
I3
I2
I3
14

Werbung

loading