Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting; Connection With The Mains; Operation; Cleaning And Maintenance - EuroLite FL-300 Bedienunganleitung

Flamelight mit leds
Vorschau ausblenden Andere Handbücher für FL-300:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Procedure:
Step 1: If replacing the lamp, remove the old lamp from the lamp-socket.
Step 2: Insert the new GU-10 230V 18 LED lamp into the lamp-socket.

Mounting

The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
Before rigging make sure that the installation area can hold a minimum point load of 10 times the device's
weight.
Do only use appropriate screws and make sure that the screws are properly connected with the ground.

Connection with the mains

Connect the device to the mains with the power-plug.
The occupation of the connection-cables is as follows:
Cable
Pin
Brown
Live
Blue
Neutral
Yellow/Green
Earth
The earth has to be connected!
If the device will be directly connected with the local power supply network, a disconnection switch with a
minimum opening of 3 mm at every pole has to be included in the permanent electrical installation.
The device must only be connected with an electric installation carried out in compliance with the IEC-
standards. The electric installation must be equipped with a Residual Current Device (RCD) with a maximum
fault current of 30 mA.

OPERATION

Before starting operation make sure that the silk cannot be drawn into the intake of the ventilation fan. With
the POWER-switch, you can switch the fan on and off.

CLEANING AND MAINTENANCE

The operator has to make sure that safety-relating and machine-technical installations are inspected by an
expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are inspected by a
skilled person once a year.
The following points have to be considered during the inspection:
1) All screws used for installing the devices or parts of the device have to be tighly connected and must not
be corroded.
2) There must not be any deformations on housings, fixations and installation spots (ceiling, suspension,
trussing).
3) The electric power supply cables must not show any damages, material fatigue (e.g. porous cables) or
sediments. Further instructions depending on the installation spot and usage have to be adhered by a
skilled installer and any safety problems have to be removed.
International
L
N
11/12
00075825.DOC, Version 1.0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis