fig. 1
Carefully remove the housing cover by sliding it to the front. Take
Off the front casing with the glas by rotating it counter-clockwise(-
fig.l); Now pull off the 3 LED refelctors and set them aside tempo-
rarily (fig.2&3)
fig.9
fig.8
Unplug the LED board and control board from the CMOSboard
and exchange the current LED ring and control board with the
new 940nm
LED
set.
INSTAR
Deutschland
- Your Specialist for IPCameras and Security Systems
940nm LED Upgradepack
Installation
/W/CÆ
Content of delivery:
lx 940nm LED board, lx LED control board, lx LED board cover, lx Installation guide
fig.2
fig. 4
fig.3
Take
off the cover
from
the LED
to take out the complete set of the LED board, the CMOS sensor board and
LED control board. (fig.4&5). Disconnect the wires that connect to the main-
board. Remove the screws on the LED board shown on the fig.6 and remove
the LED
board
from
this set.
fig.ll
fig. 12
fig.10
Plug in the new control unit and LED board to the CMOS board and fix them
into onesetunit again(asshownin fig.6) by tightening thescrewsamongthe
3 boards. Once everything is back together please reconnect the wires from the
mainboard to the control board and install the whole set back to the casing as
shown in fig. 13
for IN-5907HD
Guide
INSTARDeutschland hereby ensuresthat you will not loose your warranty by installing this additional IR LEDs.
ATTENTION: Any damages caused through the user by faulty Installation are excluded of the warranty.
LED Cont
Board
CMOS
Board
board
and loosen
the screws
on the outer
fig.13
fig.7
side
Loosen
the screws
that
connect
to the CMOS board asshown in fig.7.
fig. 14
Position
the
3 LED
reflectors
board and lay the new cover over the LED board.
Finally, reassemble the camera casing. Please re-
member to check and adjust the lense focal before
closingthefront andtopcoverto the casing.
www.instar.com
the control
board
back
to
the
LED