Fig.B
(1)(5)Adjustment of the thickness of brushed adhesive
(2)(6) Bolts of main bracket
(3) Adjusting bolt of paper pressing position
(4) Adjusting bolt of the angle of brushing adhesive surface
(7) Power socket
(8) Fuse
INSTALLATION
Please lay the machine on a steady working platform, avoiding wet place.
Proper space around should be ensured for convenient operation The can
cap, and the gliding handle should be installed.
Preparations before installation:
1. Please connect to suitable power, and check the amount of the left
adhesive. Adhesive granules should be added in time. The height of the
adhesive does not overrun the pointer inside the adhesive can.
2. After connecting the power, turn on the switch. And the adhesive can is
heated. The hot-melt time is 15-20 min.
5