Firstly, align the holes of the P-powder shuffle and Q-main framework.Paying
attention to the orientation of the P-powder baffle as shown in the figure.Then
thread the N-wheel axle through the P-powder baffle, Q-main framework, and
O-mixer in sequence.
Align the holes of the O-mixer and N-wheel axle, and then insert the D-split pin.
Fold the split pin if necessary..
Install one G-short spring, one H-gasket, one J-wheel, and one H-gasket into one
side of the N-wheel axle in order, and then lock them with I-M12 nut. Pay attention
to the orientation of the J-wheel. Repeat the steps on the other side.
5