Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Preparation - Wohler Rm 400 Bedienungsanleitung

Rohrreinigungsmaschine
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Operation

5
Operation
5.1

Preparation

Fig. 3: Control switch
Fig. 4: Fixing the drill head with the snap-
lock
Fig. 5: Releasing the snap-lock to sepa-
rate the drill head from the cable.
30
Make sure that the control switch is set to
OFF.
Select an appropriate auger and securely
connect it to the cable with the snap-lock.
To release the snap-lock after cleaning, insert
the coupling key into the hole. The coupling
key is included in the scope of delivery.
Then pull the snap-lock apart with two hands.
Inhaltsverzeichnis
loading

Inhaltsverzeichnis