INSTALLA
TION - WIRING 1
In most cases, the interface board or solenoids in the host machine will have a common (i.e. their negative terminals are all
linked by a common wire).
The Switches LKIO - LK19 can be left switched to common(up position), and the single (common) wire taken to the B rail
Note:
If a signal is applied to Input 2 before Input 1 then the unit will assume that a Pre-wash is not occurring and will ignore
subsequent signals to Input 1 until the unit has reset.
RPI,
RP2, RP3 & RP4
Remove to allow signals below
90 voltsAC
or DC (min 12V)
100V - 240VAC
Sourced from a point, which is
isolated
when
BRIGHTLOGIC LAUNDRY SYSTEMS
50/60Hz
the host machine
is off
Signal Inputs
gov-
240VAC
or DC
B Rail
A Rail
(Negative)
(Positive)
With
the
switches
in
The positive (live)
an upright position, a
signal from each
input must be taken
common
(neutral/negative)
to the
relevant
input signal can be
connection
taken
to the B Rail
Rail.
Separate
connections
provided on input 2
for
Hot
& Cold
signals.
Example sources:
Interface
Board
Solenoid
Valves
Example
Recommended
Max Size = 1.5mm2
Min
Current
on the A
Saftey Warning
If low voltage signals are used, signal wires
are
to the
wash
separate cable from the main power to the
unit.
Suitable grade wire must br used.
(LK10 - LK19)
switch to common signals
on the B Rail
00000
AIL
-
s
ATE
INPUT
1 -
Pre-Wash
INPUT
2 -
Main-Wash
(Cold Solenoid)
INPUT
2 -
Main-Wash
(Hot Solenoid)
INPUT
3 -
Fabric
Softener
COMMON
Wiring
Size
= 0.5mm2
= 0.5A
A and
B rails
should
be routed
BRIGHTLOGIC LAUNDRY SYSTEMS
ENGLISH
in