Herunterladen Inhalt Inhalt Diese Seite drucken

Fluid TUNTURI R90W Bedienungsanleitung Seite 10

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Assembly Instructions
..........................................................................................................................................................
STEP 2
REQUIRED
Left / Right Side Rail [2]
Rower Seat [3]
Left/Right Side Rails
STEP 3
REQUIRED
Main Frame [1]
Side Rails Assembly [2]
16x M8 Washers [9]
8x M8 Standard Nuts [10]
8x M8 Nyloc Nuts [11]
8x M8x45mm Bolts [13]
CAUTION
Nyloc Nuts must be outside the
standard Nut and Washer to
properly secure assembly.
NOTE
Clean Wheels and tracks weekly
with a soft dry cloth in order to
decrease the rate of wear on
both Wheels and track.
Mounting Rower Seat and Upper Main Frame
To Install the Rower Seat, spread the Left/Right Side Rails[2] slightly
and drop the Rower Seat[3] into the track.
Note: Seat Indentation must face rearward.
Mounting Rower Seat and Upper Main Frame
Next, install the Main Frame[1] onto the Side Rail Assembly[2] as
shown. You will need 8x M8x45mm Bolts[13], 16x M8 Washers[9], 8x
M8 Standard Nuts[10] and 8x M8 Nyloc Nuts[11].
Secure the front Lower Bracket first, then the Footboard but DO NOT
TIGHTEN. You may find that the Lower Bracket Bolts can be difficult
to access. You can tighten these bolts completely once the Rower is
standing in the vertical position so for the moment, simply align and
loosely thread lower Bolts/Nuts.
Nyloc Nuts must be
outside the standard Nut
Nyloc
and Washer to properly
Nuts
secure assembly.
Rower Seat
Bolt Assembly Close Up
Nyloc
Nuts
8
Seat Indentation
M8x45mm Bolt
M8 Washer
M8 Nyloc Nut
M8 Standard Nut
Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

24trw90000

Inhaltsverzeichnis