DC
SERIESEQUIPMENT
Operation
3.5 Setup
for cutting
(CT 520PD)
In order for the unit to function
correctly,
given below for correct installation
1. Read the safety rules given in this manual carefully.
2. Check on receiving
the unit that there are no defective
transportation.
3. Set your unit up in an area which is adequately
are
not
obstructed.
4. Connect
the power
supply
cable to a socket
so that the unit can be switched
off quickly
5. Your machine
has a 16 amp plug fitted,
connected
to the earth pin socket of fitted plug.
6. Make sure that the mains supply switch and any fuses have a value which ± 15% the
maximum current absorbed
by the unit. All fuses should be the slow-blow
7. Any extensions
of power supply cable should have the same cross-section
supply
cable.
The extension
leads,
however,
necessary.
It is important to note that any extension
possibly affect the cutting performance
resistance
of the cable
will reduce
voltage
cable. The supplied
length
of main cables
8. Fasten
the earth clamp to the piece to be cut, If the surface
rusty or covered with insulating
material, clean the surface so that satisfactory
between
the piece and the earth clamp can be obtained.
9. Make sure that the torch has been assembled
cutting
tip is suitable
for the cutting
current.
10. Connect
air to regulator
and adjust
regulator
II . Switch
the unit on using the main switch
12. Contact
the copper
tip of the torch to the work piece,
the arc-starting
and raise the cutting
torch about
the cutting operation.
13. Once
cutting
is over,
release
the torch button
time
45 to 75 seconds
(required
for torch cooling)
until this cooling
period
has been completed.
damage.
CAUTION
Do not point
the torch
jet at foreign
bodies.
CAUTION
Avoid
unnecessary
lighting
of
the
consumption
of the
electrode
and nozzle.
it must be installed
properly.
Follow
the procedure
parts or parts damaged
ventilated and make sure that the air vents
located
as near as possible
to the work area,
in case of emergency.
before
use check
that the greenlyellow
type.
as the power
should
only be used when absolutely
of mains cables or torch cables will
of this cutting equipment,
due to the fact that the
input, which
is determined
by the length
and torch cables
is recommended.
of the piece to be cut is painted,
with the correct
components
and that the
to deliver
5-6 bar 901tr/min
located
on the back side.
press
the button
of the forch
I mm above the work piece, and perform
to put out the arc. Aperiod
of post-flow
will follow.
Do not disconnect
Failure
to do this will result
in torch head
pilot
arc to prevent
excessive
Air compressor
during
earth
is
Earth Clamp
of the
contact
Air regulator
until
1 . Firmly tight and seal the copper air hole at IN and OUT terminal
tube
2. Tight and seal the meter with meter face rubber
air
3. Fix the connecting
4.Get
down the plastic
5.Turn on the air valve, turn up the pressure adjusting knob, turn the pressure volume (meter
inside
shows
decreasing
pressure.)
6
Scale of the meter is as follow. The volume in the picture is 6 kg
7. If the water
in thegas filtering bottle is too much, please turn on the water valve to let the
water go out.
OCTIG SERIESEQUIPMENT
CT520PD
ooo
installation
and operation
tube.
shelf with screw
as the regulator
position.
screw
and fix the regulator
on the shelf.
kg),
and
then
put down the knob.(+
means
4
Operation
power supply
Plasma
torch
by high pressure
rubber
increasing
pressure,
- means