NOTE:
The Fault Alarm Contacts are energized (CLOSE) for normal
operation and will OPEN when failures occur.
Back Panel
DIN Rail Mounting Kit
Installation Requirements
Before the installation, make sure that you have the following
conditions ready:
Phillips screwdriver.
A grounding cable.
Four wall plugs and four screws for wall mounting.
Cat 5e or higher RJ45 Ethernet cables and ber optical cables for connecting
network devices.
Site Environment:
Ensure that the operating temperature is maintained at -40℃~75℃ and the
humidity at 5%~90%.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping water, heavy dew, and
humidity.
The installation site should be well-ventilated.
Make sure that the converter is stable to avoid any hazardous conditions.
5