Step 7
Install the pedals
7.1The label with a "L" mark indicate it is the left pedal
label with a "R" mark indicate it is the right pedal.
L
R
7.2 Screw the left pedal bolt into the left crank with a wrench
anticlockwise.
L
7.3 Screw the right pedal bolt into the right crank with the wrench
clockwise.
and the
R
Step 8
Install the footboard
Install the footboard to the frame and fix it with three matching
bolts by using a wrench.
1
2
11
Step 9
Inflate the tires
Check whether the tire beads and tires are evenly seated on
the rims.Use a pump with a Schrader valve and pressure
gauge to inflate each tire to the recommended air pressure
which write on the tire sidewall.
Note: Do not over inflate or under inflate the tire.
3
Step 10
Press the button to turn on the
battery
NOTICE: Both wheels must be properly secured
before operating your bike.If you are not able to
assembly your bike, please contact us or look for
some help from a certified, reputable local bike
mechanic .Ensure all hardware is tightened
properly. Also ensure that all safety checks in the
following sections are performed before the first
use of the bike.
12