Herunterladen Inhalt Inhalt Diese Seite drucken

First Start-Up Protection Against Dry Run - Ipro Inverter Smart Flow S Betriebsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

8. FIRST START-UP
Protection against dry run
At each start-up, the controller checks for the presence of water in the system. This
procedure lasts for the first 30 seconds. If water flow is detected within 30 seconds,
the controller starts its normal operation. If water flow is not detected within 30 sec-
CAUTION
onds, the system will stop working and the dry run alarm signal will be displayed (red
indicator on the dial next to the 3 bar pressure).
If a self-priming pump is used, and if operation for longer than 30 s without flow does
not damage it, you can press and hold the
the pump maintain the movement until it is self-primed. Detection of a regular flow
will cause the start-up procedure to be terminated and the controller will switch to
automatic operation.
Long-lasting dry running may cause damage to the pump.
Control panel
Increasing the set pressure by an increment of 0.5 bar
Decreasing the set pressure by an increment of 0.5 bar
Starting up, stopping, maintaining operation
Locking, unlocking the keyboard
Restoring factory settings
Repeated progressive illumination of the pressure indicators between zero and the
set pressure: the pump is running.
Steady illumination of pressure indicators between zero and the set pressure: pump
ready for operation, no water intake.
Flashing illumination of pressure indicators between zero and the set pressure: man-
ually activated interruption in the pump operation.
The uppermost illuminated indicator on the dial indicates the current system pressure.
Installation before first start-up:
1. Install a non-return valve upstream of the controller.
2. Install half-unions of appropriate size supplied with the inverter on the pipeline.
The kit includes two 1"-diameter, 62 mm long half-unions; one 1"-diameter, 110
mm long half-union; one 1¼" and one 1½" diameter half-union, each 62 mm long.
The half-unions selected shall be connected to the pipeline with PTFE tape. When
assembling, keep in mind that the nuts of the half-unions shall be fitted with the
included rubber gaskets.
button on the panel, which will make
25
Inhaltsverzeichnis
loading

Inhaltsverzeichnis