Herunterladen Diese Seite drucken

Steelcase Obelos Kurzanleitung Seite 21

Werbung

NOTE
Using unapproved spare parts may cause
damage to the product.
}
Only components provided by Steelcase may be used
as spare parts. Coordinate the installation of differing
parts with Steelcase.
}
Comply with the specified maintenance and
inspection intervals.
The electrical equipment of the desk must be
checked regularly. Defects caused by loose
connections or damaged cables must be
rectified immediately.
Interval
Check point
during
Power cable
assembly
fixing points
All screws
Base plate
Regularly
Insulation of
the electrical
supply line
(cable)
Base plate
Functional check
Required
status
Pull the power cable
Power cable is
to see if it can be
not easy to pull
moved
out
Hold the table plate
No movements
with your hands on
detectable
the left and right and
move it up and down
Check the correct
Stand doesn't
position of the
wobble
product (height com-
pensation - leveling)
Check the insulation
No damage
for damage
Check the correct
Stand doesn't
position of the
wobble
product (height com-
5 Maintenance
Measures
(if
necessary)
Attach cable
clamps and
tighten
screws
Tighten the
screws
according to
the assembly
instructions
Adjust the
glides on the
base plate
Replace
electrical
supply line
(cable)
Adjust the
glides on the
base plate
21
EN

Werbung

loading