Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Measurement - Pce Instruments Pce-Dlt 10 Bedienungsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

ATTENTION:
ATTENTION:
6.
Adjust the position of the temperature probe so that its tip is approx. at the same
height as the bottom edge of the sample.
5

Operation

5.1

Measurement

By using the vapour resistance test chamber, you can test the vapour resistance of samples
based on the AMK-MB-005 standard.
To do so, you have to perform three 30-minute tests for each probe and let it rest for 30 minutes
between the individual tests.
To perform a test, follow these steps:
Wait for the temperature display to reach the test temperature (50 ... 55 °C). The
1.
temperature display now turns green.
Press the "Start" button. The 30-minute timer starts and can be seen in the timer
2.
display. Press the "Stop" button to stop the timer. Press the "Reset" button to cancel
it.
Wait for the timer to run out. Once the timer hits "0", the device emits an audible
3.
signal and the timer display starts to flash.
Open the door and take out the fastening rail with the sample. Let it rest for 30 minutes.
When performing a test, mind the following notes:
ATTENTION:
ATTENTION:
ATTENTION:
the yellow vertical adjustment screw to adjust the
distance.
Hot vapour leaks when opening the door.
The cover of the water tank might get very hot. Wear
gloves when removing it.
Do not touch the heating element or put your hand into the water
when the heating element is turned on. During operation, do not
touch the tank. This can cause burns.
Hot vapour leaks when opening the door.
Do not open the door during the test (e. g. to look inside) if the
glass is fogged up. This causes a drastic drop in temperature.
Wait for the timer to run out before opening the door.
© PCE Instruments
17
Inhaltsverzeichnis
loading

Inhaltsverzeichnis