Herunterladen Diese Seite drucken

Schreder GEARBLAST Installationsanleitung Seite 2

Werbung

B - DRIVER POSITIONING
C - ELECTRICAL CONNECTION
1a
REMOVE SCREWS
4
4x
2a
CONNECT AC, CONTROL, LED MODULE
WIRES
3a
MAKE THE ELECTRICAL CONNECTION
blade dimensions: 3.5 x 0.5 mm
4a
TIGHTEN THE DRIVER COVER
4x
3 Nm
4
03-75-196 | rev B | 01-2024
Cabinet
Cabinet
E
E
E
E
4x
T20
4x
T20
1.5 Nm
Use appropriate
tool for electrical
connections!
www.schreder.com
C
A: ≥70mm
C
B: ≥140mm
A
B
C: ≥180mm
A
B
D: ≥200mm
E: ≥100mm
D
These distances are
intended only as a
D
reference (Tc & Ta
must be considered!)
D
D
1b
4x
T20
2b
4x
T20
4x
T20
3b
blade dimensions: 3.5 x 0.5 mm
CM L1 L2 PE DA+ DA-
24V SHD
DA+ DA-
4b
4x
T20
A: ≥70mm
B: ≥140mm
C: ≥180mm
D: ≥200mm
E: ≥100mm
These distances are
intended only as a
reference (Tc & Ta
must be considered!)
1.5 Nm
Use appropriate
tool for electrical
connections!
LUM
V1+ V1- V2+ V2- V3+ V3-
OTP
1.5 Nm
2/6

Werbung

loading

Verwandte Produkte für Schreder GEARBLAST

Diese Anleitung auch für:

Ecoblast 3Ecoblast 4Ecoblast 5Ecoblast 6Omniblast gen2 1Omniblast gen2 2 ... Alle anzeigen