Herunterladen Diese Seite drucken

AXXAIR 122 Originalbetriebsanleitung Seite 42

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 43
ENGLISH
-42-
INNOVATIVE ORBITAL SOLUTIONS
1) To facilitate the maintenance of the machine, there are several greasers in the machine.
Clean the greaser zone before any maintenance.
Greasers for guiding in rotation.
Greaser for the clamping system.
2) Connect the pump to the machine and start the greasing.
Tips:
To make sure the grease applies homogeneously inside the guiding in rotation; rotate the machine
(with the handler or with the automatic rotation) by continuously greasing wit the pump. Do the same
with the clamp handle for the clamping system.
330B Route de Portes Les Valence - 26800 Etoile sur Rhône
Tél: +33 475 575 070 - commerce@axxair.com - www.axxair.com
Join
experience
SAS au capital de 135 720 € - RCS Romans B414 581 363 – Code APE 2841 Z – Siret 414 581 363 00028 – TVA FR13414 581 363

Werbung

loading

Verwandte Produkte für AXXAIR 122

Diese Anleitung auch für:

172222322