Herunterladen Inhalt Inhalt Diese Seite drucken

GEZE TS 5000 R BG Montageanleitung Seite 16

Gleitschiene für bandgegenseite mit integriertem rauchschalter und elektrischer feststellung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Initial operation
7.2
Installation and connection of the smoke switch
Clip on smoke switch.
X
X
Plug in 24 V cable of the of electrical hold-open device (1) and the power pack (2).
X
X
Stow away the excess cable into the power pack housing.
X X
For additional connections, see the separate document "Instructions for Installation, Commissioning, Operation
X X
and Maintenance of the GEZE Hold-Open Device FA GC".
7.3
Adjusting electrical hold-open device
9.
Open door leaf to desired hold-open angle and fix it there (1.).
X
X
Remove cable protection foils from guide rail (2.).
X
X
Loosen clamping screws of electrical hold-open device (3.).
X
X
Move electrical hold-open device until catch contacts (4.).
X
X
Screw down electrical hold-open device securely (5.).
X
X
To prevent loops from forming, tighten cable and fasten cable protection at hold open device end (6.).
X
X
GB 8
TS 5000 R BG
Fig.: 7.2.1
Fig.: 7.2.2
Fig.: 7.3.1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis