TS 5000 R BG
7
Initial operation
CAUTION!
To avoid unnecessary contamination the installation of the smoke switch should be undertaken only just
before the initial operation.
In case of early installation there is a risk that the smoke switch is contaminated by construction dust. This
shortens the life of the smoke switch considerably!
7. 1
Remove cover
Remove protective cap (1.).
X
X
Remove cover (2.).
X
X
Remove the foam lining (3.).
X
X
2.
Initial operation
1.
3.
Fig.: 6.5.1
Fig.: 7.1.1
GB 7